For M25 grade concrete, the mix proportion is typically 1:1:2 (cement:sand:aggregate). This means for 1 cubic meter of concrete, you would need 1/4 cubic meter of cement. As 1 cubic meter is equivalent to 35.32 cubic feet, and one bag of cement usually covers around 0.035 cubic meters, you would need approximately 7-8 bags of cement for 1 cubic meter of M25 grade concrete.
You are climbing from 750 to 2780' over 7 miles, so average grade is about 5.5%
The average age of a 5th grade student is typically around 10 to 11 years old, as students in 5th grade are usually between the ages of 9 and 12.
The average weight for a fourth-grade child is typically between 50 to 90 pounds, but this can vary depending on factors such as height, gender, and individual growth patterns. It's important to focus on overall health and growth rather than a specific number on the scale.
I'm unable to provide the specific age of a New Ithaca field grade 12 gauge shotgun with serial number SN460718 as firearm age can vary based on manufacturing date and production records. You may contact the manufacturer or a firearms expert to help determine the age of this specific shotgun.
On average, families in the United States spend about $700 per household on school supplies and clothing for back-to-school season. This figure can vary based on the number of children in the family, their grade levels, and individual shopping habits.
M20 - 6.20bags
M 15 grade proportion - 1:2:4 (cement:FA:CA)Cement required in kgs - 325 kg per cu.mNo. of bags required - 6.50
315 Kg/M3 approx.
Type your answer here... 11.2
For M20 grade concrete, the mix proportion is 1:1.5:3 (cement:sand:coarse aggregates). If we consider a volume of 1 cubic meter, approximately 320 kg of cement would be needed.
15 milligrams
M 15 grade - 1:2:4Cement bags required - 6.5 bagsCement required - 325 kgs
For M20 grade concrete mix proportion=1:1.5:3 And dry volume factor is 54 percent. Hence, we required to find quantities for 1.54 cum concrete. cement required=(1/5.5) x (1.54)=0.27 cum, Sand required=(1.5/5.5) x (1.54)=4.2 cum, Stone chips required=(3/5.5) x (1.54)=0.84 cum.
For M10 (1:3:6) Grade of concrete cement bag consumed = 4.4 bags/cum M15(1:2:4) Grade of concrete cement bag consumed = 6.6 bag/cum M20(1:1.5:3) Grade of concrete cement bag consumed = 8.2 bag/cum
33 grade, 43 grade and the 53 grade cement (In India)
33 grade, 43 grade and the 53 grade cement (In India)
It depends on the Grade of Concrete. general grades are M15, M20, M25 etc. here are the nos. of bag required -------------------Bag for 1 cum---------------Bag for 5 cum M15------------------- 6.4----------------------------32 M20-------------------- 8-----------------------------40 M25--------------------12----------------------------60