V=(Adeck - Apond)*h
V=(pi9.5^2-pi7.5^2)*.15 (15cm is converted to m=.15)
V=16.0cm2
well , reinforcement steel required for slab is nearly 0.7 to 0.8% of the volume of concrete so if concrete is 1 cum then steel will be 1*0.7/100 =0.007 but density of steel is 7850 kg/ cum so 0.007*7850=54.95 say 55 kg per cum so steel required to reinforce 1 cum concrete for slab is approximately 55 kgs.
How much concrete is required to fill 100 cu feet
Q1
no limited quantity, it depends on the volume required by the subject
1 archybald and sealyer
In which country?
disadvantage: - require more time to construct compare to precast concrete slab -more on-site labor required - require formwork advantage: -most commonly use -do not require storage for material (e.g. precast concrete slab need place to store)
The length of time required for tennis court construction depends heavily on the type of court being constructed. There are three main types of tennis courts: clay courts, grass courts, and concrete courts. As for grass tennis courts, the construction time depends on whether or not you already have suitable grass to build the court on. If the grass is already there, then construction of a grass tennis court need not take very long. However, if you need to grow the grass for your tennis court, then this type of court can take quite awhile to construct. Concrete court construction time is limited by the amount of time necessary to prepare the land for the concrete to be poured as well as the length of time it takes the concrete to cure after it is poured. Depending on who you hire and how long they work daily, concrete court construction can a few weeks. Weather can impact the length of time necessary to construct all types of tennis courts.
What types of movement joints are required in a concrete masonry wall
well , reinforcement steel required for slab is nearly 0.7 to 0.8% of the volume of concrete so if concrete is 1 cum then steel will be 1*0.7/100 =0.007 but density of steel is 7850 kg/ cum so 0.007*7850=54.95 say 55 kg per cum so steel required to reinforce 1 cum concrete for slab is approximately 55 kgs.
4
3
4
How do you calculate the production line personnel required?
-- construct a bird-bath -- construct a squirrel feeder -- polish the concave surface and construct a solar burger-and-dog cooker No batteries or electronics are required for any of these 'downstream applications'.
How much concrete is required to fill 100 cu feet
It depends on the size of the concrete blocks