The current London Bridge is a pre-stressed concrete box girder bridge.
iron
The current London Bridge, built in 1973, is a pre-stressed concrete structure.
The present bridge is a pre-stressed concrete box girder bridge.
The first London Bridge was built around 50AD by the Romans.
The present London Bridge is a pre-stressed concrete box girder bridge.
The bridge that was completed in 1894 was Tower Bridge, not London Bridge.
The material used to build the bridge was wood and steel
yes my grand dad helped build it
It is a pre-stressed concrete box girder bridge
Ten
It was completed in 1894
The present London Bridge is a pre-stressed concrete box girder bridge.