granite
The Desert Bedrock
A pyramid is HOLLOW.
Desert Bedrock
The pyramids are huge architectural mysteries. They were built from mastaba and limestone and several sun baked bricks. The blocks are huge.
Engineered fill is soil or crushed stone that is compacted and used as fill. Engineered fill has much to do with the placement and compaction of the material you are using and not just the material itself.
The PVC fill chart provides information on the dimensions, specifications, and performance characteristics of PVC fill material used in cooling towers.
A pillow stuffing is a material used to fill out a pillow! e.g. goose feathers.
Crushed concrete or processed fill.
The CDT code for a sedative fill is D9974. It is used to bill for the placement of material between the restoration and tooth to reduce sensitivity or pain.
A shim is is a thin or wedged piece of material used to fill gaps or spaces between objects.
Water is standing in the crater or if subsurface material is unsuitable to fill the crater
Spackle or joint compound are commonly used to fill wall holes. They are easy to apply and sand, providing a smooth finish for painting.