answersLogoWhite

0


Best Answer

The equipments power requirements, and the mains voltage. The output of the power supply must be able to deliver the correct voltage to the equipment, at the appropriate wattage. Additionally, it should be capable of operating on the supplied mains voltage and wattage.

User Avatar

Wiki User

12y ago
This answer is:
User Avatar

Add your answer:

Earn +20 pts
Q: What must you match when purchasing a power supply?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Related questions

What is theTransformer rating in a power supply?

a power supply must deliver xxx watts to a load the transformer must match the load capabilities plus its own loss


Why the case and power supply must match the motherboard?

Case: Your motherboard must be able to fit in your case and must support your motherboard size (correctly placed standoffs). Power Supply: You can't have a shortage of power or else your power supply will get overloaded and "die", or even possibly explode for that matter.


Which of the following bullets is not true about the origins of purchasing and supply management?

For supply management to have a strategic focus, supply professionals must have an understanding.


What does the power supply unit must be toasted mean?

The statement "the power supply must be toasted" is a rather idiomatic way of saying, the power supply must have been destroyed by excess current.


How can you measure the ampere or watt for power supply?

You can measure the current and power of a 'power supply', using an ammeter and a wattmeter. With the power supply connected to its load, the ammeter must be connected in series with the power supply's input. The wattmeter's current coil must also be connected in series with the power supply's input, and its voltage coil must be connected in parallel with the supply, taking the instrument's polarity markings into account.


Can you use a train transformer to power a cb radio?

For any power supply application you hav eto measure the supply specifications with the load specifications. If the supply is AC the load should be designed to use AC and the same for DC to DC. The voltages should match up. The current that the load requires must be less than or equal to the current that can be provided by the supply. Lastly the wires connecting the supply to the load must be sized to carry the current required by the load.


What FireWire connector must use a separate power supply?

No FireWire does not need a separate power supply to operate. FireWire is used to connect peripheral devices to a computer.


What do different players do in a soccer match?

All have to do their path, goalkeeper must save the goal. Midfielders must supply the striker and the striker must score.


What is regulated power power supply?

is an embedded circuit or stand alone unit the function of which is to supply a stable voltage to a circuit or device that must be operated within certain power supply limits .


Will a 15DC 1000mA power supply work on a device needing 15DC 1500mA power supply?

Your question is confusing, but if you are asking whether you can use a 9V/250 mA adapter to supply a load device rated at 5 V/1000 mA, then the rule is quite straightforward. The adapter's rated output voltage must match that of the intended load, but its rated current must exceed that of the load. So in your example, you cannot use the adapter with the intended load.


Does ps3 slim have a power supply?

No you must plug it in it is not a portable untit


How can install power transformer?

If you are referring to 'power transformers' used in transmission systems, then the requirements are far too complicated to be answered in this forum. If, on the other hand, you are referring to a 'power transformer' in the sense of a small transformer used to reduce your mains or supply voltage at home, then the volt ampere rating of the transformer must equal or exceed the load requirement. The primary and secondary voltages must match the primary supply voltage and the voltage requirement for the load. Any requirements for earthing (grounding) must be observed.