Want this question answered?
gravel
a challenge for the tower bridge was getting all the right stuff under one budget and how long the bridge took to build
Yes, because the mathematical process they used in that architecture was really well done. +++ Not inherently so, it isn't. The design mathematics are fully understood for any bridge type, and the individual bridge is designed for its own location and intended loads (plus safety factor).
it is a type that you like
The newest type of bridge is a cable-stayed bridge
The Ionic and Doric orders of architecture.
It is a suspension bridge.
A suspension bridge.
beam bridge
The Severn Bridge is a suspension bridge.
The type of mill that was involved in the conflagration that hit Granix was a flax mill. This area of Ireland, around Belfast, was known for its flax mills.
a type of bridge