Q: When are the tendons laid on the formwork for concrete?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Related questions

What is the sawN formwork?

Sawn formwork is formwork that for concrete structure that needs to have plaster and paint finish.


Define ''striking''as regards to formwork?

It is dismantling formwork once concrete is sufficiently hard.


What kind of wood used for formwork for concrete?

cypruc


What is the meaning of formwork in civil engineering?

Formwork is used for the shaping of concrete structures to aid in the hardening phase of conrete.


The differences between kicker and kickerless formwork?

the only difference is for the next pour of concrete your formwork should be on a perfectly set layout. You dont have a STARTER to place your formwork against, so more precision is required for the next lift of concrete.


What is a wrot formwork?

Wrot Formwork is fair finish surfaces made up of steel or iron. Formwork is when wooden boards and bolts are used to shape concrete while it is setting.


What has the author John George Richardson written?

John George Richardson has written: 'Formwork notebook' -- subject(s): Formwork, Concrete construction 'Concrete Craft Notebook' 'Concrete notebook' -- subject(s): Concrete construction 'Supervision of concrete construction' -- subject(s): Engineering, Management, Concrete construction


What is pile cap formwork?

Pile cap formwork is the formwork built to mold the concrete that binding together the pile or group of piles and the structure supported by the piles such as structure's foundation or column.


Purpose of slump test for concrete?

To check the consistency of the concrete; to determine if the concrete flow smoothly into the shape of the formwork. It is a quick check to see if the concrete is suitable for use.


What is form-working?

Formwork is a mould or die used to shape and support the concrete until it attains sufficient strength to carry its own weight. The formwork is a kind of "baking tin" , which holds the concrete until it hardness to attain the required shape and size.


What is the difference between formwork and shuttering?

I Think there is no Difference between the two.. both are the same..Formwork is the term given to either temporary or permanentmoulds into which concrete or similar materials are poured.In the context of concrete construction, the falseworksupports the shuttering moulds.and same for shuttering also...


What is the difference between shoring and re-shoring?

When referring to concrete work (using a structural suspeneded slab as an example) Shoring - support structure for formwork before concrete is poured and while it is curing. The formwork is the plywood and the shoring is the posts. Reshoirng - support structure for the cured or partially cured concrete - installed after the formwork and shoring have been removed. Usually used as additional support for the partial cured concrete (which has reduced strength) to allow construction work to continue on the slab until it has fully cured.