answersLogoWhite

0


Best Answer

Check that what the consignment note says is included, is included. Or just sign for them with the comment contents not seen, or not examined.

User Avatar

Wiki User

9y ago
This answer is:
User Avatar

Add your answer:

Earn +20 pts
Q: When checking in a load what must be done?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Continue Learning about Engineering
Related questions

When checking a load what must be done with a load that says mixed on them?

When checking in a load, what must be done with cases that say "Mixed" on them


When checking in a load what must be done with cases that say Mixed on them?

When checking in a load, what must be done with cases that say "Mixed" on them


When checking a load what must be done with cases that say mixed on them?

When checking in a load, what must be done with cases that say "Mixed" on them


Is the checking done strictly in the cbse board examinations?

No. Checking is done according to marking scheme keeping benefit of students in mind.


Who to work out the mechanical advantage of a multiple pulleys?

If there are 4 strands holding up the load then the tension in each strand is 1/4 of the load. When the load is raised 1 cm the work done must be achieved by pulling the end by 4 cm because of the reduced force required, but the energy must be the same. Therefore the mechanical advantage is equal to the number of strands supporting the load.


How do you get achiever 1 on learn to fly 2?

You have to do all challenges in story mode in one single round... After you have done that, you must click "load game" and then load the auto-safe file! After then, you get the medal achiever 1


How do you get achiever 2 on learn to fly 2?

You have to do all challenges in story mode in one single round... After you have done that, you must click "load game" and then load the auto-safe file! After then, you get the medal achiever 1


How is stress analysis on jib cranes done?

A stress analysis on Jib cranes must be done before they can be placed in usage. The analysis consists of mathematical equations considering the length of the crane and maximum load capacity.


Is strict checking done in the board paper?

yes


Why wont the zwinky world load?

Have you dowloaded it safely? Checking whether Cookies have been enabled?


What is the difference between capacity and load?

The difference between load and capaity is as follows:Load is the amount of work that MUST be done, amount of work scheduled ahead of a manufacturing facility.Capacity is the amount of work that CAN be done, and measures the highest output of work expressed as a rate with current product specifications, work force, plant, equipment etc.


What steps can you take to ensure the load weight and dimensions are within the capacity of the equipment?

Checking the weights of the load and the accuracy of the measuring instruments are some of the steps that I can take to ensure that the load weight and dimensions are within the capacity of the equipment.