It is located in Pakistan.
It is located in Pakistan.
The Ghazi-Barotha Dam is located in the Haripur District of Khyber Pakhtunkhwa, Pakistan. It is situated on the Indus River, approximately 50 kilometers northwest of Islamabad. The dam is part of a hydroelectric power generation project aimed at harnessing the river's water for electricity and irrigation purposes.
Only one main dam, Tarbela Dam. Other is for hydro-power generation only, called Ghazi-Barotha Dam. A barrage after Tarbela diverts some of the water towards this Dam and after generation of electricity the water is diverted back to indus. Indus have many barrages. Jinnah barrage, Chashma barrage, Taunsa barrage, Guddu barrage, Shukkur barrage and Kotri barrage. Dam under construction: Diamer-Bhasha Dam Future Dam: Kala Bagh Dam
Akhori Dam Donhngi Dam Ghazi Barotha Dam Gomal Dam Gomal Zam Dam Hub Dam Kalabagh Dam Karoonjhar Dam Khanpur Dam Mangla Dam Mirani Dam Shakidor Dam Simly Dam Tarbela Dam
At present there are 19 dams Rank Topic Wikipidia views 1 Kalabagh Dam 2 Tarbela Dam 3 Mangla Dam 4 Shakidor Dam 5 Gomal Zam Dam 6 Ghazi Barotha Dam 7 Dohngi Dam 8 Khanpur Dam 9 Rawal lake 10 Guddu Barrage 11 Sukkur Barrage 12 Akhori Dam 13 Mirani Dam 14 Hub Dam 15 Simly Dam 16 Karoonjhar Dam 17 Indus Basin Project 18 Gomal Dam 19 Wali Tangi For more information, see the Related Link.
There are 14 dams in Pakistan. They are:-Akhori Dam-Donhngi Dam-Ghazi Barotha Dam-Gomal Dam-Gomal Zam Dam-Hub Dam-Kalabagh Dam-Karoonjhar Dam-Khanpur Dam-Mangla Dam-Mirani Dam-Shakidor Dam-Simly Dam-Tarbela DamOther names that came up under 'Dams in Pakistan are':-Guddu Barrage-Indus Basin Project-Rawal Lake-Sukkur Barragehttp://wiki.answers.com/What_are_the_names_of_the_various_dams_in_Pakistan#ixzz19cbuQFaG
The 1450 MW Ghazi-Barotha Hydropower Project is run-of-river project in Pakistan located on River Indus about 2 hour drive from Islamabad. About 1,600 cubic meter water per second is diverted from the river near Ghazi Town about 7 km downstream of Tarbela Dam (3,478MW). It then runs through an open power channel 100 meter wide 9 meter deep and 52 km long down to the village of Barotha where the power complex is located. The World Bank classed it "A" for adequate attention to environmental and social issues. The project took about 10 years and $2.2 billion to complete. The GBHP General Manager is Mr. Muhammad Hanif. Tel: (+92 57) 264-0580 Answer posted by: Parvaiz Naim <parvaiz.naim@gmail.com>
Taymour Ghazi's birth name is Taymour Shawn Ghazi.
Ghazi Albuliwi is 6'.
Ghazi Kanaan was born in 1942.
Mohammad Ghazi died in 1998.
Mohammad Ghazi was born in 1913.