Liquid tight metal conduit may serve as a grounding means in sizes up to and including what in.
This is one of those questions that has a lot of answers! In a residence I would want it as short as possible, however you can legally run it 10 feet, if you use steel flex or metallic liquid tite in your raceway system the maximum length of the flex can only be 6 feet with the remaining 4 feet of conduit. Inspectors in some areas like for the service panel located in the first stud bay available nearest the service entrance, this usually keeps the conduit and wire length to a minimum.
grounding material is not a good word but as short as possible is a good answer the entrance panel must be connected to the best possible ground this is called the grounding electrode the grounding electrode conductor connects to the ground bar in the entrance panel if the panel has a a neutral the neutral bar can be bonded to the ground bar Grounding electrodes form best to worse well casing water pipe (NOT plastic) buried plates or wire grid or bonded reinforcing steel driven rod if you are talking about distances to the panel it should be centered about shoulder height doors need to have about 2' of clearance in all directions weather open or shut
Absolutely not. #2awg conductors are only good for about 100 amps depending on Cu or al. see nec table 310-16.
The service panel itself is probably less than $200.
It is not in parallel. You put a breaker in existing panel and use that to feed the subpanel. The Amperage of this subfeed breaker should match the rating of the new panel. For example a 100A breaker might be typical. Remember that ground and neutral are only "bonded" at the main panel. Usually a subpanel has a means to separate the neutral and ground in a subpanel. Be careful since everything about doing this is dangerous.Another AnswerYes, you can have two breaker panels in parallel. If you had a 100 amp panel on a 200 amp service (or increase the size of the service, check with your power company on the size of your service, you could add a second 100 amp panel in parallel with the first. You can have up to 6 disconnects per service, but they must be located adjacent to each other or in the same enclosure. So either install the second panel beside the first or a 100 amp disconnect beside the first panel and feed out of the disconnect to the new panel located where you need it.
This is one of those questions that has a lot of answers! In a residence I would want it as short as possible, however you can legally run it 10 feet, if you use steel flex or metallic liquid tite in your raceway system the maximum length of the flex can only be 6 feet with the remaining 4 feet of conduit. Inspectors in some areas like for the service panel located in the first stud bay available nearest the service entrance, this usually keeps the conduit and wire length to a minimum.
Liquid tight metal conduit may serve as a grounding means in sizes up to and including what in.
On a 1999 Ford Windstar : What Ford refers to as the " service panel " is located in the cargo area on the passenger side of the vehicle
Connect other end to the ground lug in the service entrance part of your panel.
Behind the service panel on the right side of the cargo area
The fuse panel diagram for a 2001 Buck LeSabre is located in the service manual. It outlines the location of each fuse and the components it attaches to.
grounding material is not a good word but as short as possible is a good answer the entrance panel must be connected to the best possible ground this is called the grounding electrode the grounding electrode conductor connects to the ground bar in the entrance panel if the panel has a a neutral the neutral bar can be bonded to the ground bar Grounding electrodes form best to worse well casing water pipe (NOT plastic) buried plates or wire grid or bonded reinforcing steel driven rod if you are talking about distances to the panel it should be centered about shoulder height doors need to have about 2' of clearance in all directions weather open or shut
Absolutely not. #2awg conductors are only good for about 100 amps depending on Cu or al. see nec table 310-16.
located under the right hand side of the Instrument panel, according to Haynes Service manual.
In the CEC (Canadian Electrical Code) the code states that from the outside meter base to the first over current device that, the run can be no longer than 20 feet.
it is located somewhere unser or inside dash panel it is located somewhere unser or inside dash panel
remove the bench seat behind the drivers seat. remove the service panel from the interior panel on the drivers side.