answersLogoWhite

0


Best Answer

Intended use and design speed of highway

User Avatar

Wiki User

14y ago
This answer is:
User Avatar

Add your answer:

Earn +20 pts
Q: Which consideration is least important to initial planning for highway erosion control?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Continue Learning about Engineering

What are some of the erosion and sediment control measures that has to be taken in a construction project?

One of the most important is the prevention of sediments and storm water runoff from harming clean running water. Other control measures include Vegetation Protection, Banks and Drains Stabilisation, Organised soil and sediment stockpiles and erosion prevention. These measures has to be included in an Erosion and Sediment Control Plan that will be prepared by an environmental engineering expert. It is best to seek advise from environmental consultants for an ensured construction project.


Administers programs aimed at protecting the environment improving waterway navigation flood and beach erosion control and water resources development?

United States Army


What are the Environmental constraints in engineering businesses?

Environmental engineers plan, build, and test erosion control systems, water control systems, and waste management and utility plants. Their projects vary from large to small scale, and may include collaborating to build a city's water system, landfills, and recycling centers.


What are some technologies people can use to slow the erosion of barrier islands?

They can use sand bags to slow down the rate of erosion on barrier islands.


What are the slatted fences along the beach called?

This wooden slatted fencing is called a sand fence. Its function is similar to a snow fence used along highways in the north to control drifting snow. The sand fences provide:Dune erosion maintenanceCoastline preservationVegetation preservation improving natural erosion controlPreserve and mark out sensitive areas and preserve habitat ecologyControl of the blowing sand (or snow) across highways or airport runways

Related questions

Which consideration is most important to initial planning for highway erosion control?

Intended use and design speed of highway


Erosion control for highways first become important?

NovaNET Answer:In the planning and location of the highway route


When does erosion control for highways first become important?

In the planning stage; during the choice of the Right-of-Way's terrain. In the planning stage and location of the highway route.


What if the initial planning for highway erosion control?

encroachment of highway


Erosion control first becomes important at the first evidence of erosion?

False


True or False erosion control first becomes important at the first evidence of erosion?

False. Erosion control should begin before the first evidence of erosion. When building bridges over waterways, construction contractors are already devising ways to control erosion so the bridge does not fall into the water later on.


Why is sediment yield an important consideration in a discussion of water supplies?

Soil erosion (epa stuff) in areas such as storm water run offs.


Which do you think it is important that an erosion control blanket break down after a few weeks or months?

I think the real reason it is important that an erosion control blanket breaks down after a few weeks , or months is that it may get in the way of the plants that have now grown.


Why is it use to understand what weathering and erosion are?

It can help us understand how the world can break down itself by the natural ways of the world. Erosion is important when planning to build roads, and other structures. Weathering is important to know how things break down into solutes.


How are erosion control blankets used?

I think it's important so it doesn't impact our environment.by devon akemon


What is meant by the term erosion control?

Erosion control is the term used in the practice of preventing or controlling wind and water erosion in agriculture, land development and construction.


Information of mechanical control of soil erosion?

Mechanical erosion control measures are implemented to minimize onsite and offsite impacts of these activities, as well as to rehabilitate degraded lands. Often, mechanical erosion controls are applied in combination with vegetative erosion control techniques.