Want this question answered?
Not a good idea. T500 is a slow blow. F500 has a faster response characteristic, as in fast blow. You could go the other way around in a pinch if it was an F500 sub'd for a T500 but not the T500 for an F500.
Try 20 /1000 inch on this rototiller.
Should be 15000 Lbs GVW
Start by taking the number in Celsius and multiply it by 9. Then divide that number by 5, and then add 32. This is how you convert Celsius to Fahrenheit or use the equation F = (9/5)C + 32In this case, the answer is about 500 degrees Fahrenheit.
3.4.1 Structure of an NC Part Program Commands are input into the controller in units called blocks or statements. Block Format: 1. Fixed sequential format 2. Tab sequential format 3. Word address format EXAMPLE: Assume that a drilling operation is to be programmed as: 1. The tool is positioned at (25.4,12.5,0) by a rapid movement. 2. The tool is then advanced -10 mm in the z direction at a feed rate of 500 mm/min., with the flood coolant on. 3. The is then retracted back 10 mm at the rapid feed rate, and the coolant is turned off. 1. Fixed sequential format 0050 00 +0025400 +0012500 +0000000 0000 00 0060 01 +0025400 +0012500 -0010000 0500 08 0070 00 +0025400 +0012500 +0000000 0000 09 2. Tab sequential format 0050 TAB 00 TAB +0025400 TAB +0012500 TAB +0000000 TAB TAB 0060 TAB 01 TAB TAB TAB -0010000 TAB 0500 TAB 08 0070 TAB 00 TAB TAB TAB -0000000 TAB 0000 TAB 09 3. Word address format N50 G00 X25400 Y125 Z0 F0 N60 G01 Z-10000 F500 M08 N70 G00 Z0 M09