the heating on 2 and a half bars all day wastes more electricity then the heating on full blast for 15 minutes a day.
Blast furnace .
First: Roast the Galena in a blast furnace for 30 minuets. Second: Add Carbon to the blast furnace to remove impurities. Third: Tag off your lead from the bottom of the blast furnace.
Pig iron is produced when heating * Iron ORE (not iron as the question says!) * Coke * limestone in a Blast Furnace.
its used a fuel , but has less calorific value as the carbon monoxide percentage is less which is the main combustible gas in the b.f gas. its used in heating the blast of hot air in the blast furnance itself and also can be used in rolling mill, sinter plant, and many more where you need heating
The sound signals that it is a sailing vessel underway when you hear one prolonged blast plus two short blasts every two minutes.
5 minutes to charge.1 second to blast.
to heat the iron so that it separates from other elements in the ore
Foggy conditions....a case of restricted visibility... according to International Regulations for Preventing Collision at Sea Rule 35... "A Power driven vessel making way through the water shall sound at intervals of not more than 2 minutes one prolonged blast." So hearing a prolonged blast every 2 mins in restricted visibility we can deduce that its a power driven vessel making way through water.
Rules of the Road Rule 35 Sound Signals in Restricted Visibility/International (a) A power driven vessel making way through the water shall sound at intervals of not more than 2 minutes one prolonged blast.
one prolonged blast
The sound signals that it is a sailing vessel underway when you hear one prolonged blast plus two short blasts every two minutes.
One prolonged blast should be sounded every two minutes.