It was built by Bolliger & Mabillard Consulting Engineers Inc. Jim Wintrode worked with Walter Bolliger and Claude Mabillard and Robert Mampe to complete it.
Montu has generally been well received. Montuhas consistently ranked highly. It is the only roller coaster to remain as one of the top 15 steel roller coasters since the award's inception in 1998. Montu is also one of only seven roller coasters to appear in the top 50 for all 15 years. It debuted at position 3 in 1998, before rising to position 2 the following year. Montu has remained at position 14 for 2011 and 2012.
That will depend on which part of the roller coaster you're talking about. The moving parts (the cars and the driving mechanisms etc) will be designed by a mechanical engineer. The structure of the roller coaster itself (the towers and trackway and the foundations on which it stands) will be designed by a civil engineer.
Roller coasters are designed by engineers. Roller coaster engineers make anywhere between $45,000 and $119,000 per year. Most roller coaster engineers are mechanical engineers and the median salary for mechanical engineers is $74,920.
The translation of the English word, 'Roller Coaster' is..Roller Coaster
Roller coaster's doesn't take the place of anything but it shows possession. Example: roller coaster's design
The first roller coaster was call Gravity Switchback RailwayIt was designed by LaMarcus A. ThompsonIt was built in 1884I hope this helps you i just finished researching it for a report i have to get in:(((
The slope of a roller coaster describes how steep the roller coaster is. Knowing the angle of the slope will tell you how steep a roller coaster is.
roller coaster
Roller Coaster = rodilyo
You ride in the seats of a roller coaster.
Velocity is constant when the middle of the roller coaster is parallel with the ground (when the tangent of the curve the roller coaster is on has a slope of 0 at the center of mass of the roller coaster).
Twister - roller coaster - was created in 1999.