Want this question answered?
Spring tides are stronger because they occur when the sun moon and earth are lined up in a straight line causing a stronger force on earth's tides.
Plasmodesmata are membrane-lined channels between plant cells that allow materials to move among cells, but communications occur via signalling hormones that may or may not move through plasmodesmata. Some do, and others move through the matrix of cell walls that lies between the individual cells in the plant.
stream lined body of a fish helps to reduced friction
Na+ channels are inactivating, and K+ channels are opening.
The lined space is reserved for the loading and unloading of wheelchairs.
In a straight line
Plasmodesmata: are narrow membrane-lined channels through the cell wall that connect adjacent plant cells.
The planets are lined straight.
ponies
Straight line winds are, convective wind gusts, outflow and downbursts. Straight-line wind is wind that comes out of a thunderstorm.
The scattered reflection occurs when a straight ray of light is reflected from hitting rough concrete.
To cancel the stamp so that it can't be used again.
Where cracks form in the asphalt/concrete, repair crews fill the cracks with tar to keep water from seeping in and widening the cracks into pot holes.
VDF Flooring stands for Vacuum Dewatered Flooring. This is a special technique to do the Concrete Flooring to increase the Compressive Strength, Tensile Strength, Abrasion Resistance and to minimize the Shrinkage and Floor Wraps. Tying Line Dori (Threads) as per the slope requirements, Laying Steel Channels at spacing of 4 Meters in straight lines along the Line Dori, Taking levels as per the slope, Fixing the channels using concrete and left to set for a minimum of 24 hours, pouring the concrete in between the channels, spreading using Shovel(Kudal/Parahs), Compacting the concrete using Double Beam Screed Vibrator running over the channels twice to achieve maximum compaction, final levelling of the concrete using the Bull Float/Aluminimum Bottom (also called Fanti/Baddha) running over the channels, leaving the surface to get set for next 4-5 Hours while the surface is strong enough to bear the load of the floater machine by giving an imprint not more than 5 mm (time depending upon the factors like water content in concrete, moisture in the substrate, weather conditions etc), application of the Power Floater on the surface until the surface is sufficiently compacted & levelled with no major lines appearing anymore, final finishing using the Power Trowel and trowelling until the required finish isachieved.
It is a three sided straight lined shape with 3 interior angles that add up to 180 degrees.
It is a three sided straight lined shape with 3 interior angles that add up to 180 degrees.
Steel and geometry, tension, straight, aches and channels make a good bridge