answersLogoWhite

0

Add your answer:

Earn +20 pts
Q: Why change is inevitable in complex system and give example of software process activities that help predict changes and make the software being developed and more resilient to change?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Related questions

Why softwares are developed or engineered but not manufactured?

Software is developed or engineered; it is not manufactured in the classical sense. Although some similarities exist between software development and hardware manufacture, the two activities are fundamentally different. In both activities, high quality is achieved through good design, but the manufacturing phase for hardware can introduce quality problems that are nonexistent (or easily corrected) for software. Both activities are dependent on people, but the relationship between people applied and work accomplished is entirely different. Both activities require the construction of a "product" but the approaches are different.


What company developed the software?

The software Bookends was developed and is sold by Sonny Software. Bookends software is a bibliography, information, and reference management system for students and professionals.


What company developed the software Bookends?

The software Bookends was developed and is sold by Sonny Software. Bookends software is a bibliography, information, and reference management system for students and professionals.


What is a target link?

TargetLink is a type of software for the automatic generation of production codes. The software TargetLink was developed by dSPACE GmbH in the year 2009.TargetLink is a type of software for the automatic generation of production codes. The software TargetLink was developed by dSPACE GmbH in the year 2009.TargetLink is a type of software for the automatic generation of production codes. The software TargetLink was developed by dSPACE GmbH in the year 2009.TargetLink is a type of software for the automatic generation of production codes. The software TargetLink was developed by dSPACE GmbH in the year 2009.TargetLink is a type of software for the automatic generation of production codes. The software TargetLink was developed by dSPACE GmbH in the year 2009.TargetLink is a type of software for the automatic generation of production codes. The software TargetLink was developed by dSPACE GmbH in the year 2009.TargetLink is a type of software for the automatic generation of production codes. The software TargetLink was developed by dSPACE GmbH in the year 2009.TargetLink is a type of software for the automatic generation of production codes. The software TargetLink was developed by dSPACE GmbH in the year 2009.TargetLink is a type of software for the automatic generation of production codes. The software TargetLink was developed by dSPACE GmbH in the year 2009.TargetLink is a type of software for the automatic generation of production codes. The software TargetLink was developed by dSPACE GmbH in the year 2009.TargetLink is a type of software for the automatic generation of production codes. The software TargetLink was developed by dSPACE GmbH in the year 2009.TargetLink is a type of software for the automatic generation of production codes. The software TargetLink was developed by dSPACE GmbH in the year 2009.


On software development project what kinds of activities can be performed in parallel?

On software development project what kinds of activities can be performed in parallel. Why the activity graph sometimes hides the interdependencies of these activities.


Is Tu Video developed by Matias MX Software?

Tu Video is developed by Matias MX Software. There are several users of Software Informer which use this program although Software Informer indicates that they are not affliliated with Matias MX Software.


What are two activities that the operating system manages?

the two activities that the operating system manages are the (1) System Software and(2) Application Software.


What is meant by software process?

Software process includes those activities that activities, methods , practices and transformations that are used to create and maintain software products. having efficient software practices can lead us to various benefits.


What company developed Berkeley DB software?

The company that developed Berkeley DB software is Sleepycat Software, later Oracle Corporation. Berkeley DB software provides an embedded database for key(value) data.


How can you differenciate between QA QC and amp Testing?

These all are related and to some point, can be considered as same activities too, but there are distinct points that spaced out QA, QC and testing.QA stands for Quality Assurance. Its a software testing life cycle comprises of various activities related to QA to make sure the process implementation, various procedures and standards in perspective to verification of developed software and planned requirements. In software qa services, the main focus is on processes and procedures followed during the testing.QC stands for Quality Control. It includes activities that ensure the endorsement of a developed software as per requirements those were acknowledged. QC is focused on actual testing by executing the software with the intention to identify defect through implementation of procedures and process. QC is a Product-oriented activities and also a corrective process. QC can be considered as the subset of Quality Assurance.Testing is part of Quality Control and is achieved in the software testing phase. Testing comprises of activities that confirm the identification of bugs or defects in software applications without correcting it. Testing is also product-oriented and main focus is on actual software testing to prevent bugs.


Which software track your activities with your knowledge?

Cookies.


In which software language C software was developed?

No language, directly in assembly language.