Joseph B. Strauss built the bridge to finish what his father started. His father built the bridge so he could show that he was a bright man, and for the challenge.
This is not
an accurate answer. See discussion for more information.
joseph b. strauss
It is designed by Engineer Joseph B. Strauss and build in Wednesday April9,2003
Many wanted to build the bridge. The proposal finally took place in 1916 in the San Fransisco Bulletin by former engineering student James Wilkins. They estimated the cost of the bridge for about 100 million super super impractical for the time. The asked bridge engineers the question on if it could be done for less. Joseph Strauss answered it and was very ambitious having built 300-400 bridges already. He said he could do a draw bridge there for 17 million. Strauss was chief engineer in charge of overall design and construction of the bridge project. However, because he had little understanding or experience with cable-suspension designs,responsibility for much of the engineering and architecture fell on other expert..
We'll Build Them a Golden Bridge was created in 1996.
they shat them out
The Golden Gate Bridge created thousands of jobs during its construction during the Great Depression. It still employs hundreds of people. The bridge carries many thousands every day to work and recreation.
steel and concrete.
The Golden Gate Bridge started construction in 1933 by Joseph B. Strauss and his helpers the other people that built it was a huge family, the Busenlehner's that came all the way from straubling Germany. MY family is actually the ones who helpt built it we are a noble family in germany but now i live in the usa... in Alabama haha but were still a pretty big deal in Germany. It was finished in 1937.
It took 4 years i did a report on this bridge my answer is right Construction began on January 5, 1933 and the first pedestrians crossed the bridge on May 27, 1937. The first cars crossed on May 28, 1937.
In days the Golden Gate Bridge took 1643.5 days to build.
The Golden Gate Bridge construction began on January 5, 1933. It was completed and the bridge was opened to automobiles on May 28, 1937, a day after it was opened to the pedestrians.
January 5th, 1933 was the day the bridge started to be built.