Moisture causes problems in Transformers, and is not desired. Pulling a vacuum causes the moister in the oil impregnated paper and nonmetallic supports to evaporate, and as the vacuum is held, this moister can be removed.

User Avatar

Wiki User

13y ago
This answer is:
User Avatar
More answers
User Avatar

Wiki User

11y ago

Connect an ammeter in series with the transformer that have to be connected in parallel with an appropriate apparatus. The reading of the current must be within the range specified on the device.

This answer is:
User Avatar

Add your answer:

Earn +20 pts
Q: Why do you do load test in transformers?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Related questions

What do you mean by test?

Its a test conducted on two identical 1- phase Transformers to determine the efficiency at different loads (without actually connecting any load).


What do you mean by sumpners test?

Its a test conducted on two identical 1- phase transformers to determine the efficiency at different loads (without actually connecting any load).


Is wattmeter reading under no load test is equal to iron loss of the transformer?

Yes; that is the principle used in no-load tests on transformers. The current in the copper windings is zero on the secondary and low on the primary, so the copper loss is negligible.


What are the advantages of automatic load sharing of transformers?

advantages for automatic load sharing of transformer with protective analysis


How do you test potential transformers?

find a decepticon


What is paralleling of transaformers?

Paralleling transformers will increase the effective capacity available to the load. There are important requirements before transformers can be paralleled, so it's simply not the case of connecting any two transformers in parallel.


What is the minimum load have to go for a new transformer?

All transformers have a power rating given in kVA which determine the maximum load that can be connected to that transformer.


What is the initial load in Rockwell hardness test?

The initial load in Rockwell hardness test is 10KGf.


What is mean of resistive load?

i think it is high value resistance as it is used in Transformers to get the output voltage.


Is transfomer output voltage designed to full load?

Transformers are designed to run at specific voltage levels, and they are designed to handle a maximum load (known as "full load"); this load is usually based on the amount of current that can be pushed through the transformer without overheating, so if 1/2 voltage is applied, full load would be 1/2 of normal. Some "complicated" transformers may have other limitations (dual voltage transformers may have two different full loads specified, and they may not be directly proportional relative to voltage).


How do you load test a Harley Davidson motorcycle battery?

You can take it to a battery place and they can test it under a load.


Why should dc series motor can be operated for no load and light load?

dc motors can be operated at no load as well as at load condition.But by using the swin burns test the efficiency can be calculated at no load which is more benficial than load test.At industries this swin burns test is used because for load test we have to give separate supply for the load to run.In no load test that power is saved.