It takes 2L of water to make 1 kg of concrete. That is approximately 4800L per cubic meter.
Concrete, Mortar, Brick, Block, Re bar for support
That's sort of a strange question. A concrete slab is a horizontal surface -- it's meant to be a surface you stand on or build things on. Concrete blocks are usually used for vertical surfaces -- walls. I believe that poured concrete walls are more expensive than concrete block walls. You wouldn't use concrete blocks as a substitute for a concrete slab.
Concrete is very important to the Romans because they were the first people who invented the hydraulic cement based concrete. The Roman did build very many concrete structures like the Pantheon in Rome.
The concrete slump test is used to measure an aspect of concrete. This test is used to measure the workable of concrete as well as its freshness and health.
The tools used to build theSydney Opera House were, Basic construction tools. Sydney Opera house is a reinforced concrete construction.
They used concrete.
the concrete used in a house is 47% cement
The volume of concrete used to build the Millau bridge is 85,000 m3 (cubic meters). The weight of this volume of concrete is 206,000 metric tons.
No one knows the exact amount of concrete used to build I-90. However, it did cost 1 billion dollars to build.
about 6600000 tons of concrete!! natal
Concrete, glass, wood and steel were used to build the Calgary tower.
Concrete, stone and steel.
Concrete and steel .
glass and concrete
Reinforced concrete
They used reinforced concrete and soapstone.