answersLogoWhite

0

Preparing and cleaning a surface prior to painting will allow the paint to remain on the surface for a longer period of time without chipping or peeling.

User Avatar

Wiki User

14y ago

What else can I help you with?

Related Questions

Does the primer need to be applied evenly before painting?

Yes, the primer should be applied evenly before painting to ensure a smooth and uniform surface for the paint to adhere to.


Is it ok to undercoat a used vehicle?

Yes. However, if you have surface rust, it should be removed before the undercoating is applied.


How many coats of primer should be applied before painting a surface for optimal coverage and adhesion?

For optimal coverage and adhesion, it is recommended to apply two coats of primer before painting a surface.


How many coats of primer should be applied before painting a surface for optimal coverage and durability?

For optimal coverage and durability, it is recommended to apply two coats of primer before painting a surface.


When should a career portfolio be prepared?

A career portfolio should be prepared before starting a job search.


What surface should turkey be prepared on?

A turkey should be prepared on a sterile surface to prevent contaminating the meat. The surface should also be a hard surface to reduce damage risk, and to make sterilizing after preparation easier. A cookbook can be a good resource for preparing a turkey. Instructions, tips for cooking, and recipes can be found in a cookbook.


Are discounts applied before surcharges?

Discounts should come first and surcharges should be applied later.


How long should Roundup be applied before rain?

Roundup should be applied at least 30 minutes before rain to ensure it has time to be absorbed by the plants.


How thick should the non-skid coating be when applied to the surface?

One sixteenth of an inch


Can carrrot souffle be prepared and cooked the night before serving?

No, a soufflé should be prepared and cooked immediately before eating, any delay and the soufflé will sink and spoil.


How should cement be placed into an indirect restoration for delivery?

Cement should be placed into an indirect restoration by first ensuring the internal surface of the restoration is clean and dry. The appropriate cement is then evenly applied to the internal surface, using a small spatula or applicator to achieve a uniform layer. It's important to avoid overfilling, as excess cement can lead to complications during seating. Finally, the restoration is carefully positioned onto the prepared tooth structure, ensuring proper alignment before applying gentle pressure to seat it fully.


The Retained Earnings Statement should be prepared?

after income statement, before the balance sheet