Q: Can direct costs display a fixed or variable behavior pattern?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Related questions

Assuming that direct labor is a variable cost product costs under variable costing include only?

B. Direct materials, direct labor, and variable manufacturing overhead.


Direct labor a variable cost or semi-variable cost?

Direct labor is variable cost as it varies with the change in level of production of units.


How do you do a direct variation with an inverse variation problem?

If a variable X is in inverse variation with a variable Y, then it is in direct variation with the variable (1/Y).


Are all direct cost are variable?

Yes generally direct costs are variable costs but there may be some direct costs which can be fixed costs as well.


Relationship between manipulated variable and responding variable?

direct proportion


What is the differences between Fixed Direct labor with variable direct labor?

Direct labor which do not vary with level of production is fixed direct labor while labor vary with change in production is variable direct labor.


What is the sentence of direct?

Please direct your attention to the display table.


As rf microwave spectrum analyzer provides a direct display of?

rf microwave spectrum analyzer provides a direct display


Is direct costing the same as variable costing?

Variable costing is called marginal costing while direct costing is separate concept.


Is direct Materials a fixed or variable cost?

Variable. Jessica Nichole Sims


Are direct costs variable costs?

If direct labor don't change with number of units product then it is fixed cost but if it changes with the change in production units then it Is variable cost.


Examples of semi variable direct costs?

An example of semi variable direct costs is wages. Since semi variable costs are partially fixed and variable, regular labor is fixed costs, as production rises and workers have overtime the overtime is considered the variable cost.