Research and development (R&D) is typically considered a variable cost, as it can fluctuate based on the level of activity or projects undertaken by a company. Costs associated with R&D can vary widely depending on the scope, duration, and resources needed for different projects. However, some elements of R&D, like salaries for permanent staff, may be seen as fixed costs. Overall, the nature of R&D costs largely depends on the specific context and structure of the organization.
It is a fixed cost
The relataionship of cost between the level of production is determine the fixed or variable cost if cost change with production level then it is variable cost otherwise fixed cost.
Variable cost = Total Cost/ fixed cost
it is obviously variable
No, Janitorial Cost is not a variable cost, it is a Fixed Cost.
It is a fixed cost
Fixed cost and variable cost is equal to total cost as per following formula: Total Cost = Fixed Cost + Variable Cost
its a fixed cost
The relataionship of cost between the level of production is determine the fixed or variable cost if cost change with production level then it is variable cost otherwise fixed cost.
fixed and variable
variable
Type your answer here... fixed cost + variable cost = total cost
Variable cost = Total Cost/ fixed cost
it is obviously variable
No, Janitorial Cost is not a variable cost, it is a Fixed Cost.
If it varies with the level of production then it is variable cost otherwise it is fixed cost.
Variable