As-built drawings are typically the responsibility of the contractor or construction team, who must document any changes made during the construction process compared to the original design plans. These drawings are then often reviewed and finalized by the architect or project manager to ensure accuracy. Ultimately, the owner or client may also play a role in confirming the final as-built drawings, especially if they are needed for maintenance or future renovations.
An inspection drawing looks like/is a schematic, detailing the exact mechanical layout of a factory, building, etc ... A production drawing is an illustration of what the buliding would look like, if it had yet to be built/dressed. Think of a movie set. The production drawing would show you what the space would look like, complete with specific lighting and people included, to give a sense of scale.
A drawing table is a specialized flat surface designed for artists and draftsmen to create detailed drawings or plans. It typically features a large, adjustable tabletop that can be tilted to various angles for comfort and precision. Some drawing tables come with built-in storage for art supplies and drafting tools. They are commonly used in fields such as architecture, engineering, and fine arts.
Architectural drawing Machine drawing Industrial drawing sheet metal drawing Aeronautical drafting marine drawing computer drawing
The phrase "as-built" in construction is equivalent to "as-is." Drawings deemed "as-built" are thus drawings that show the EXISTING conditions as they are, or "as-is" — these are the actual existing conditions as opposed to designs or proposed conditions, which are more common for the content of drawings. As-built drawings can be documented either after or during construction. When it's after construction, a qualified technician collects accurate data to reconstruct the drawings. When it's during construction, the design drawings are redmarked for editing. For example, if you are a Contractor installing sewer pipe in the road at a buried depth of 5.00' and you suddenly encounter an abandoned pipe and must change your buried depth to 6.50' , then you should be responsible for the as-built conditions. The installing contractor should redmark his set of drawings to show how the sewer line was actually installed so that a draftsman can later edit the drawings into an "as-built" set.
Artists use charcoal for drawing. The drawing is a charcoal drawing or sketch.
IN DRAWING WHAT DOES IT MEAN WITH AS-BUILT
frontalis
govenor
The state legislators redraw congressional districts.
If you mean who was responsible for building the Colosseum, it was the Flavians. Vespasian began it in 72AD, Titus dedicated and opened it in 80, and Domitian added finishing touches to it sometime after 82. After the Flavians, the responsibility for maintenance was ultimately the emperor's, even though minor officials would oversee the day to day upkeep.
the people that built it
Chinese
President James Monroe is responsible for drawing up the monroe doctrine.
Thomas Jefferson
The vessel was meticulously planned by several naval engineers. Many plans were penned in the Drawing Offices, which were onsite.
An employee whose drawing wage or basic salary has upto rs 6500/- responsible to pay pf contribution 12 % from employer & employee respectively.
John A. McDonald