As-built drawings are typically the responsibility of the contractor or construction team, who must document any changes made during the construction process compared to the original design plans. These drawings are then often reviewed and finalized by the architect or project manager to ensure accuracy. Ultimately, the owner or client may also play a role in confirming the final as-built drawings, especially if they are needed for maintenance or future renovations.

User Avatar

AnswerBot

1mo ago

What else can I help you with?

Continue Learning about Art & Architecture

What is inspection drawing and production drawing?

An inspection drawing looks like/is a schematic, detailing the exact mechanical layout of a factory, building, etc ... A production drawing is an illustration of what the buliding would look like, if it had yet to be built/dressed. Think of a movie set. The production drawing would show you what the space would look like, complete with specific lighting and people included, to give a sense of scale.


What is Drawing table?

A drawing table is a specialized flat surface designed for artists and draftsmen to create detailed drawings or plans. It typically features a large, adjustable tabletop that can be tilted to various angles for comfort and precision. Some drawing tables come with built-in storage for art supplies and drafting tools. They are commonly used in fields such as architecture, engineering, and fine arts.


What is the meaning of 8 branches of technical drawing?

Architectural drawing Machine drawing Industrial drawing sheet metal drawing Aeronautical drafting marine drawing computer drawing


What is an As-built drawing?

The phrase "as-built" in construction is equivalent to "as-is." Drawings deemed "as-built" are thus drawings that show the EXISTING conditions as they are, or "as-is" — these are the actual existing conditions as opposed to designs or proposed conditions, which are more common for the content of drawings. As-built drawings can be documented either after or during construction. When it's after construction, a qualified technician collects accurate data to reconstruct the drawings. When it's during construction, the design drawings are redmarked for editing. For example, if you are a Contractor installing sewer pipe in the road at a buried depth of 5.00' and you suddenly encounter an abandoned pipe and must change your buried depth to 6.50' , then you should be responsible for the as-built conditions. The installing contractor should redmark his set of drawings to show how the sewer line was actually installed so that a draftsman can later edit the drawings into an "as-built" set.


What is drawing with coal called?

Artists use charcoal for drawing. The drawing is a charcoal drawing or sketch.

Related Questions

What does as built means?

IN DRAWING WHAT DOES IT MEAN WITH AS-BUILT


What Muscle responsible for drawing the scalp forward?

frontalis


Who or what is responsible for drawing new US Congressional districts in Texas?

govenor


Who is responsible for drawing congressional district?

The state legislators redraw congressional districts.


Are the Roman responsible for the Roman coliseum?

If you mean who was responsible for building the Colosseum, it was the Flavians. Vespasian began it in 72AD, Titus dedicated and opened it in 80, and Domitian added finishing touches to it sometime after 82. After the Flavians, the responsibility for maintenance was ultimately the emperor's, even though minor officials would oversee the day to day upkeep.


Who is responsible for looking after the pyramids of Giza?

the people that built it


What ethnic group was responsible built the railroads in the you?

Chinese


Who was involved on monroe doctrine?

President James Monroe is responsible for drawing up the monroe doctrine.


Who was responsible for getting the University of Virgina built?

Thomas Jefferson


Was the titanic just built or sketched before it was built?

The vessel was meticulously planned by several naval engineers. Many plans were penned in the Drawing Offices, which were onsite.


Who is responsible for PF?

An employee whose drawing wage or basic salary has upto rs 6500/- responsible to pay pf contribution 12 % from employer & employee respectively.


Who was responsible for getting the railroad built in British Columbia?

John A. McDonald