answersLogoWhite

0


Best Answer

Michaelangelo did not actual invent scafolding. Scaffolding had long since been used in many situations wher hard to reach areas had to be worked on. When he was working on the SSistene chapel the pope had ordered a scaffold built for him to work from by Michelangelo's arch-enemy Bramante. The problem was that this involved drilling holes in the ceiling that had to have the work done on it. Michael Angelo complained to the pope and the pope said to him. do it your way then. So he built it supported from the ground instead.

User Avatar

Wiki User

13y ago
This answer is:
User Avatar

Add your answer:

Earn +20 pts
Q: Why did Michelangelo invent scaffolding?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Related questions

Why was Michelangelo upset about the way the scaffolding was being built?

Bramante's design for the scaffolding in the Sistine Chapel meant there would be holes left in the ceiling once Michelangelo had finished painting it, and there would be no way to cover the holes after the scaffolding was removed, so Michelangelo took it upon himself to design the scaffolding for the project.


How was michelangelo able to paint the Sistine Chapel from up high?

In order to paint the ceiling of the Sistine Chapel Michelangelo spent years lying on his back on scaffolding.


How did Michelangelo make the painting of the creation of man?

Scaffolding was constructed to allow all the paintings on the ceiling to be completed.


Michelangelo Quotation about finishing Sistine Chapel?

Thanks to his friend and biographer Vasari much of what Michelangelo said is recorded. Pope Julius II grew impatient and threatened to have Michelangelo thrown from his scaffolding. He had to give in to the Pope and had the scaffolding dismantled and the ceiling uncovered sooner than he had intended and is reported to have said 'That is why that work was not carried on as far as I would have wished. The Pope's impatience prevented.'


How was the Sistine Chapel ceiling painted?

Mostly laying on his back on scaffolding that brought him within reach of the ceiling.


Who was offered the Sistine Chapel ceiling before Michelangelo and refused it?

This is news to me, even though I have read a lot abot the Sistine Chapel and about Michelangelo. So for the time being I believe that Michelangelo had the first offer. Or rather, that Pope Julius more or less forced Michelangelo to do it. Before Michealangelo began his work the Chapel walls were a showcase for works of art by Ghirlandaio, Perugino, Signorelli and Botticelli. The Papal architect was Bramante who Michelangelo suspected of setting him up for failure due to poor scaffolding Bramante had built for the project.


What are scaffolding proteins?

Scaffolding proteins are molecules that provide a structural framework for organizing other molecules within a cell. They serve as a platform for bringing together multiple signaling proteins, enzymes, and receptors to facilitate efficient cellular processes, such as signal transduction or protein trafficking. By anchoring proteins in specific locations within the cell, scaffolding proteins help to coordinate and regulate complex signaling pathways.


What made Michelangelo's work so important?

They help us now make and invent new things that help us in our lives.


What are the duties of scaffolding supervisor?

scaffolding foreman mean


What is scaffolding training?

Scaffolding training teaches you all about the scaffolding that hangs on buildings. Since you will spending quite a bit of time on scaffolding, you need the class in order to be safe on it.


What is Cantilever Scaffolding, and what services related to Cantilever Scaffolding does MTEC Scaffolding offer to clients?

Cantilever scaffolding is a type of scaffolding system that is commonly used in construction projects to provide a secure and stable platform for workers to perform various tasks at height. Cantilever scaffolding is designed to be supported by a single vertical beam, which is anchored to a solid structure, such as a building or a concrete foundation. MTEC Scaffolding is a reputable scaffolding company that specializes in providing high-quality scaffolding services to clients in the construction industry. They offer a range of services related to Cantilever scaffolding, including design, installation, dismantling, and maintenance of scaffolding systems. Their team of experienced scaffolding professionals understands the unique requirements of each construction project and provides tailored solutions to meet the specific needs of their clients. They use only the highest quality scaffolding materials, ensuring the safety and stability of the scaffolding systems they install. MTEC Scaffolding is committed to providing a safe and reliable service to their clients. They strictly adhere to all health and safety regulations and provide regular safety training to their employees. Their focus on safety and quality has earned them a reputation as one of the leading scaffolding companies in the industry. In addition to their Cantilever scaffolding services, MTEC Scaffolding offers a range of other scaffolding services, including traditional tube and fitting scaffolding, system scaffolding, and temporary roof systems. They also offer scaffolding hire services, which enable clients to rent scaffolding equipment for their projects. Overall, MTEC Scaffolding is a reliable and professional scaffolding company that offers high-quality Cantilever scaffolding services and a range of other scaffolding solutions to meet the needs of their clients in the construction industry.


How many scaffolding pipes are required to construct 1000 cubic meters of scaffolding?

It depends on the lengths of the scaffolding pipes.