Sorry but the original question can not be answered here, as you need to understand Plumbing codes and in the end you must follow local codes.
Same as this question, how to plumbing kitchen.
There is too much involved to explain the process.
I would suggest getting a book on plumbing to accomplish this task.
Same as a double sink BUT with one extra TEE
To effectively plumb a double sink, you will need to install a double sink drain kit, which includes two drain pipes, a tee fitting, and a trap. Connect the drain pipes from each sink to the tee fitting, then connect the trap to the tee fitting and the main drain line. Make sure to secure all connections tightly and test for leaks before using the sinks.
To properly plumb a double kitchen sink, you will need to connect the drain pipes from both sinks to a central drain line using a P-trap. Make sure to measure and cut the pipes accurately, use plumber's tape or sealant on the connections, and secure everything tightly. Test the system for leaks before using the sink.
2 Inch double tee in the middle, pick up both other outlets with the tee, plumb to drain. Have a clean out just above the p-trap, for peace of mind.
To plumb a bathroom sink effectively, first install the drain pipe and trap underneath the sink. Connect the water supply lines to the faucet and the hot and cold water valves. Make sure all connections are tight and secure. Test the sink by running water to check for leaks. Adjust as needed.
To properly plumb a bathroom sink, you will need to connect the sink's drain pipe to the main drain line using a P-trap. The P-trap helps prevent sewer gases from entering the bathroom. Make sure to secure all connections tightly and test for leaks before using the sink.
Instead of the Y you would use on a double sink, use a T on the center one and tie them together that way. That's the only difference, There is no way to tell exactly what you will need for yours since all situations are different.
I-ID-DONTK-KNOWWORK IT OUT
To plumb a new sink in a bathroom renovation project, you will need to first shut off the water supply, remove the old sink, install the new sink and faucet, connect the drain pipe, and then turn the water supply back on to test for leaks. It is important to follow the manufacturer's instructions and local building codes for proper installation.
Same as any sink. The vacuum breaker installs in the backwash unit. Just plumb in hot & cold, and plumb out a drain line.
Yes, you can install a single sink instead of a double sink in your kitchen.
To plumb a utility sink effectively, first, gather the necessary tools and materials such as pipes, fittings, and a P-trap. Next, connect the sink's drain to the main sewer line using the appropriate size and type of pipes. Ensure that the pipes are securely fastened and properly aligned to prevent leaks. Finally, test the sink by running water to check for any leaks and make adjustments as needed.