answersLogoWhite

0

Cylinder head bolt torque for a 1991 Jeep with 2.5 L engine (P engine code) is: Step 1: 22 ft lbs Step 2: 45 ft lbs Step 3: Bolts 1-6 110 ft lbs Step 4: Bolt 7 100 ft lbs Step 5: Bolts 8-10 110 ft lbs

User Avatar

Wiki User

17y ago

What else can I help you with?

Related Questions

What do you torque the main bearings down to in a 1991 Chevy 350 2 bolt main engine to?

70 ft lbs


Engine bolt torque specs on C-15 catepillar engine?

torque c-15 for engine brake


What is the torque specs of a Toyota corolla 1.3L 2E engine?

There are torque specifications for every bolt in a Toyota Corolla 1.3 L engine. The head bolt torque specifications is 70 pounds.


What is the Cylinder head bolt torque for 4JG2 engine of Isuzu bighorn?

What is the cylinder head bolt torque for isuzu bighorn.


WHAT IS THE HEAD BOLT TORQUE SETTING ON A TOYOTA 3L ENGINE?

What head torque for e


Rod bolt torque for 1.9L escort lx?

What is the torque of 1991 ford escort piston rods


What is the head torque for a John Deere 4239D engine?

head torque sequence, ft lbs, 4239d jd engine


What is the head bolt torque for 1.6 Mazda protege?

whar are the torque specs for head bolt on a 1999 Mazda protege 1.6 engine


Mercedes 300e cylinder head bolt torque specs?

what is the over all torque for a Mercedes 300e 1991


1991 Chevy 350 head bolt torque specs?

65ft. LBS.


What is the head bolt torque specs for 1988 Chevrolet nova?

For a 1988 Chevrolet Nova with a 1.6L engine, the head bolt torque specifications are typically 65 ft-lbs (88 Nm) for the initial torque. After that, it is advisable to follow a specific sequence to ensure even tightening, often involving a final angle torque of 90 degrees. Always refer to the specific service manual for your engine variant for precise instructions.


What are the torque specs for a 1979 ford F150?

== 12-16 Foot pounds (Final torque) Note: to torque bolts & nuts, start in center using crisscross pattern working outward The Head Bolt Torque 65-72 Foot pounds (Final torque) Torque sequence ------------ front | 9 5 1 3 7 | of | 10 6 2 4 8 | engine ------------ Final torque must be reached in 3 equal steps Recheck final torque in sequence The Intake Bolt Torque 23-25 Foot pounds (Final torque) Torque bolts & nuts in numbered sequence --------------- | 5 1 9 11 3 7 | | 6 4 12 10 2 8 | --------------- The Main Bearing Cap Torque 60-70 Foot pounds (Final torque) The Main Bearing Cap Torque 60-70 Foot pounds (Final torque) The Rod Bearing Cap Torque 19-24 Foot pounds (Final torque)