typically one pallet, i believe theres 42 80lb bags on a pallet.
Forty five 80 pound bags of cement are needed to make one cubic yard of concrete.
25
Cement comes in bags that weigh 94 lbs. The volume of the bag is approximately 1 cubic foot. If you want to mix concrete which is a mixture of a coarse aggregate (gravel) and a fine aggregate (sand) and something to bond the two aggregates together (cement) then firstly you need to know the strength concrete that you require. For 1 cubic yard of 3000psi (pounds per square inch) strength you will need about 6 bags cement 12 cubic feet of sand and 24 cubic feet of gravel. Rule of thumb is the ratio should be 1:2:4 (cement:sand:gravel)
To determine how many bags of concrete are needed for a 10x10 patio, you first need to calculate the volume of concrete required. A 10x10 patio is 100 square feet, and if you plan for a thickness of 4 inches (0.33 feet), the volume would be 100 sq ft x 0.33 ft = 33 cubic feet. Since standard concrete bags are typically 80 pounds and cover about 0.6 cubic feet, you would need approximately 55 bags of concrete (33 cubic feet ÷ 0.6 cubic feet per bag).
4.4 Bags
Forty five 80 pound bags of cement are needed to make one cubic yard of concrete.
7 cement bags per 1 cubic meter of concrete......
4 bags of 50 kg each= 200 kg of cement.
One cubic meter of concrete is equal to 1.308 cubic yards of concrete. If there are 5 1/2 bags of cement in 1 cubic yard of concrete, there would be 7.2 bags in 1 cubic meter of concrete. These are the 94 pound bags of portland cement or roughly 40kg bags so figure 8 bags total. Some will be left over
According to Blue Circle it takes 108 bags of concrete to get a cubic meter
15 milligrams
The answer is, remarkably, 6. Answer: "6 sack" or "6 bag mix" has six bags of cement per cubic yard of concrete mix. Since each sack/bag contains 94 lbs of dry cement, this equals 564 lbs of cement per cubic yard of concrete.
M20 - 6.20bags
8
25
For M25 grade concrete, the mix proportion is typically 1:1:2 (cement:sand:aggregate). This means for 1 cubic meter of concrete, you would need 1/4 cubic meter of cement. As 1 cubic meter is equivalent to 35.32 cubic feet, and one bag of cement usually covers around 0.035 cubic meters, you would need approximately 7-8 bags of cement for 1 cubic meter of M25 grade concrete.
108