it takes 45 Bags of 80# mix to make a cubic yard
1.67 cubic yards.
0.89 cubic yards.
1.8 cubic yards will do it.
You will need 0.56 cubic yards of concrete.
You will need 17.8 cubic yards of concrete.
The term "yards" of concrete means cubic yards.
.029 cubic yards of concrete weighs aproximately 93.96lbs
1.67 cubic yards.
0.89 cubic yards.
1.8 cubic yards will do it.
You will need 0.56 cubic yards of concrete.
You will need 17.8 cubic yards of concrete.
10.67 Cubic Yards
the minimum is 2 yards.
1.85 cubic yards.
39 cubic yards is 29.81 cubic meters.
A typical 80-pound bag of concrete mix yields about 0.6 cubic feet of concrete. A 3-yard mixer has a capacity of 81 cubic feet (3 cubic yards). To fill the mixer, you would need approximately 135 bags of 80-pound concrete mix, since 81 cubic feet divided by 0.6 cubic feet per bag equals about 135 bags.