4 and 2/7
Approximately four weeks. There are 31 days in most months, so that is 3 days more than 4 weeks. Four of the months have 30 days, so that is 2 days more than 4 weeks. One month has only 28 days, which is exactly four weeks.
Just over 4. 4 x 7 is 28 days, and July has 30 days.
Not usually. It depends on how many days in a month. For advertisements when they say "month" it usually means 30 days. In most other cases it will also mean 30 days.
Four months typically contain about 17 weeks and 2 days, assuming an average month length of 30 days. This can vary slightly depending on the specific months involved, as some months have 28, 30, or 31 days. However, for a rough estimate, 4 months is generally considered to be around 17 weeks and 2 days.
104 days is about 15 weeks.
30 weeks x 7 (days in a week) = 210 days.
There are 4 weeks and 2 days in 30 days. This is calculated by dividing 30 by 7 (the number of days in a week), which gives 4 weeks with a remainder of 2 days.
30 days
215 days is equivalent to 30 weeks and 5 days.
There are 30 working days in six weeks.
Thirty days is equivalent to four weeks and two days.
one month (30 days) is having = 4 weeks 1 day is having = 4/30 weeks 147 days are having = 4/30*147 = 19 weeks
60 weeks and 6 days.
About 30 weeks. A month is not a fixed number of days, but averages 30.4 days. So 7 months is 213 days, or 30 weeks and three days.
30 days.30 days.30 days.30 days.30 days.30 days.30 days.30 days.30 days.30 days.30 days.
30.
About 6 weeks and 2 days.