To calculate the volume of concrete needed for a slab that measures 74 inches long, 48 inches wide, and 4 inches thick, first convert the dimensions to feet: 74 inches = 6.17 feet, 48 inches = 4 feet, and 4 inches = 0.33 feet. Then, multiply the dimensions: 6.17 ft × 4 ft × 0.33 ft = approximately 8.16 cubic feet. Therefore, you will need about 8.16 cubic feet of concrete for the slab.

User Avatar

AnswerBot

6h ago

What else can I help you with?

Related Questions

How much concrete do you need for a16ft by 6ft slab?

For a 4-inch thick slab you will need at least 1.2 cubic yards.


How much concrete would you need for a slab 16x16x4?

At least 3 cubic yards for a 4-inch slab. You'll need 4.75 cubic yards for a 6-inch slab.


How much concrete do you need for a slab?

For a 4-inch depth you will need at least 7 cubic yards.


How much concrete do you need for a 24x24 slab 8 in thick?

You will need at least 14 cubic yards.


How many yards of concrete will you need to do a 20x20x4 slab?

how many yards of concrete will i need to do a 20 x20 x4 slab


How much concrete do you need for a 16'x16' slab 4 deep?

3.16 Cubic Yards


How much concrete do you need for a 24x24 slab?

For a 4-inch depth you will need at least 7 cubic yards.


How much concrete is needed for 8 square meters of slab?

Well, isn't that a lovely question! To calculate the amount of concrete needed for a slab, you'll need to consider the thickness of the slab. On average, for a 10cm thick slab, you would need about 0.8 cubic meters of concrete for 8 square meters. Just remember to always double-check your calculations and enjoy the process of creating something beautiful!


How much Concrete do you need for a 22 squared slab?

A 22x22 foot slab at a 4-inch thickness/depth requires a minimum of 6 cubic yards.


How much concrete you need for slab 10ft by 10ft by 4 inches thick?

1.25 cubic yards for a 4-inch slab. 2 cubic yards (1.85) for a 6-inch slab.


How much concrete do you need for a slab 10 foot by 10 foot by 4 inches?

A minimum of 1.3 cubic yards.


How much concrete do you need for a slab 45x65 inches?

Oops . . . please repost your question and include the depth of the concrete. You have to have all 3 dimensions in order to calculate volume (Cubic Yards of concrete).