(4-ft x 2-ft x 3-in) = (4-ft x 2-ft x 1/4 ft) = (2 cubic feet) / (27 cubic feet per cubic yard) = 0.0741 yard3 (rounded)
If the "3" in the question was supposed to be a thickness of 3-ft instead of 3 inches, then
(4-ft x 2-ft x 3-ft) = (24 cubic feet) / (27 cubic feet per cubic yard) = (8/9) = 0.889 yard3 (rounded)
Either way, expect to pay for a whole yard, or whatever the minimum delivery is.
its about 12x5x67 respectively
It depends on the depth required
2.15
14.81 yds
22 cubic yards
0.246914 cu. yards (6.666667 cu. ft ) of concrete is needed.
2
231
It takes 2L of water to make 1 kg of concrete. That is approximately 4800L per cubic meter.
how much do concrete layers make an hour
its about 12x5x67 respectively
To calculate the amount of concrete needed for a project, you need to determine the volume of the area to be filled with concrete. This can be done by multiplying the length, width, and height of the area. Once you have the volume, you can then calculate the amount of concrete needed by dividing the volume by the coverage area of one cubic yard of concrete. This will give you the total number of cubic yards of concrete needed for the project.
96 cubic feet of concrete
a lot.
First find out how much concrete is needed for your project thwn do the calculations.
1.54321 cubic yards See the related link below
4.23776 cubic yards