To calculate the amount of concrete needed to cover an area of 22 feet by 26 feet at a depth of 4 inches, first convert the depth from inches to feet: 4 inches is approximately 0.33 feet. The volume in cubic feet is then calculated as 22 ft × 26 ft × 0.33 ft, which equals about 189.24 cubic feet. Therefore, you would need approximately 189.24 cubic feet of concrete to cover the specified area.
about 17 yards of concrete (it's sold by the cubic yard)
An 80lb bag of concrete you can at your local home improvement store covers about 4 square foot at 2" thick. So you would need about 144 bags of 80lb concrete.
Spread it evenly, then leave your hands in the cement for 4-6 hours to spread excess cement.
The number of concrete blocks that make up a foot depends on the size of the blocks. Standard concrete blocks, often referred to as cinder blocks, typically measure 16 inches long, 8 inches high, and 8 inches deep. To cover a linear foot, you would need about 0.75 of a standard 16-inch block to reach a total of one foot in length.
30.81 cubic yards
about 17 yards of concrete (it's sold by the cubic yard)
An 80lb bag of concrete you can at your local home improvement store covers about 4 square foot at 2" thick. So you would need about 144 bags of 80lb concrete.
It would depend on what item the ton is comprised of. The area of a ton of feathers would be greater than the area of a ton of concrete. Answer 2 It would also very much depend on how thick the material was. A ton of feathers might take up less room than a ton of concrete if the feathers were a mile high and the concrete was an inch thick.
54sqare feet
If it is the same as concrete it will cover 162 square feet. concrete covers 81 square feet by 4" deep
I was thinking about getting some concrete pavers. How much would it cost me to buy them?
Spread it evenly, then leave your hands in the cement for 4-6 hours to spread excess cement.
The specific gravity of limestone concrete is 2.37. Therefore 5 gallons of concrete would weigh 94.8 pounds.
The depth of the pour would also be necessary to calculate the volume of concrete needed.
25856 / 27 = 958 yards of concrete @ $75 per yard = $71,850
To calculate the amount of concrete needed to cover a driveway that is 9 feet wide and 150 feet long, you first find the area by multiplying the width by the length: 9 feet × 150 feet = 1,350 square feet. The depth of the concrete layer is also needed to determine the volume. For example, if you want a thickness of 4 inches (0.33 feet), the volume would be 1,350 square feet × 0.33 feet = 445.5 cubic feet.