To calculate the volume of concrete needed for footings that are 28 feet long, 2 feet wide, and 3 feet deep, use the formula for volume: length × width × depth. This results in a volume of 28 ft × 2 ft × 3 ft = 168 cubic feet. Therefore, you will need 168 cubic feet of concrete for the footings.
It depends how thick you want it
You will need at least 14 cubic yards.
To calculate the amount of concrete needed, first convert all measurements to feet. The volume of concrete required can be found using the formula for volume: length × width × height. For a slab that is 62 feet long, 30 feet wide, and 5 inches thick (which is 5/12 feet), the volume is 62 × 30 × (5/12) = 155 cubic feet. Therefore, you will need approximately 155 cubic feet of concrete.
For a 4-inch depth you will need at least 7 cubic yards.
You need the dimensions of the column to calculate the volume. The formula would need to include the three dimensions in some form.
The formula for calculating force vs displacement depends on the specific situation. In general, the formula is force = k * x where k is the spring constant and x is the displacement from the equilibrium position. For different situations, such as friction or gravity, additional factors may need to be included in the formula.
You need to use an integral. And the formula for an integral will vary depending on the shape of your non square area.
You need to know the principal amount, the rate and the time. Then a very simply formula for calculating interest is I = PRT where P is the principal amount, R is the interest rate and T is the period of time in years.
It depends on your formula, but you may need them to change the order of operations.
This is the formula for calculating a taper: Large diameter of the taper minus the small Diameter of the taper divided by the length of of the taper will give you the taper per inch. You will also need to know the included angle of the taper if you ar cutting this taper. This formula would be Tangent of the included angle divide by 2.
Your question is not clear,if you are just predicting it then whats need of finding.The formula for calculating speed is distance/time
To measure how much concrete you need for your project, calculate the volume of the area to be filled with concrete by multiplying the length, width, and height. Then, divide the total volume by the yield of the concrete mix to determine the amount needed in cubic yards or cubic meters.
To determine the volume of a gas using the formula for calculating gas volume, you would need to know the amount of gas in moles (n) and the gas constant (R), and the temperature (T) and pressure (P) of the gas. The formula for calculating gas volume is V (nRT) / P, where V is the volume of the gas. By plugging in the values for n, R, T, and P into the formula, you can calculate the volume of the gas.
There is no way to calculate cost for a square foot of concrete (?" w x ?" l). In order to calculate cost you need to first calculate volume which requires a third dimension of height (?" w x ?" l x ?" h). Concrete is usually sold by the cubic yard (36" wide x 36" long x 36" high). Another factor in calculating price of concrete is distance to delivery location.
Well assuming the depth of concrete is going to be 1 meter you will need 846 cubic meters of concrete.
The formula for calculating the volume of a cuboid is width x length x height