answersLogoWhite

0

Oops . . . please repost your question and include the depth of the concrete. You have to have all 3 dimensions in order to calculate volume (Cubic Yards of concrete).

User Avatar

Wiki User

13y ago

What else can I help you with?

Related Questions

How much concrete will you need to fill a hole that is 18 inches around and 24 inches deep?

about 432 cubic inches


How much concrete do you need to fill a hole 6 inches by 42 inches?

None, as a hole which is 6 inches wide and 42 inches long has no depth and thus no volume.


How much concrete is need for 800 Square feet 5 inches deep?

12.30 cubic yards


How much concrete do you need to pour in a floor measuring 28 feet wide 72 feet long and 6 inches deep?

you would need 37.33 yards of concrete or 38 to be safe


How many yards of concrete do you need for a 36 inches by 6 inches post hole?

If the post is a 6 x 6 you will need about 1/10 of a yardof concrete


How much concrete do you need in a footpath?

To determine how much concrete you need for a footpath, first calculate the area by multiplying the length by the width of the path. Then, multiply the area by the desired thickness of the concrete (typically 4-6 inches for footpaths). Convert all measurements to the same units (e.g., feet) and remember that one cubic yard of concrete covers about 81 square feet at a thickness of 4 inches. This calculation will give you the total volume of concrete required.


How much concrete do you need for a slab 10 foot by 10 foot by 4 inches?

A minimum of 1.3 cubic yards.


How much concrete do you need for a Slab 74x48x4?

To calculate the volume of concrete needed for a slab that measures 74 inches long, 48 inches wide, and 4 inches thick, first convert the dimensions to feet: 74 inches = 6.17 feet, 48 inches = 4 feet, and 4 inches = 0.33 feet. Then, multiply the dimensions: 6.17 ft × 4 ft × 0.33 ft = approximately 8.16 cubic feet. Therefore, you will need about 8.16 cubic feet of concrete for the slab.


How do you pour concrete on old concrete?

What you need to do first is to check if you have that room near the threshold of the door for that extra concrete(which is minimum of 3.5" inches) then you need to remove the top surface of the old concrete to be rough surface don't break too much just about an 1"wash clean and let it dry and only then to install the new concrete.


How much cubic meter of concrete will use for 1000sft slab?

For a 1000 sqft slab with a thickness of 4 inches, you would need approximately 33 cubic meters of concrete. This calculation is based on the assumption that 1 cubic yard of concrete covers 81 square feet at 4 inches thick.


How much concrete you need for slab 12ft by 10ft by 4 inches thick.?

12 ft x 10 ft x .333 ft (4 in) = 39.96 cu ft. You need enough concrete for 40 cubic ft.


How much concrete you need for slab 12ft by 10ft by 4 inches thick?

12 ft x 10 ft x .333 ft (4 in) = 39.96 cu ft. You need enough concrete for 40 cubic ft.