answersLogoWhite

0

what are the major issues in building a oil refinery

User Avatar

Wiki User

15y ago

What else can I help you with?

Continue Learning about Chemical Engineering

How long does it take to build an oil refinery?

about a fiver


What do you need to build a refinery?

To build a refinery, you need several key components: land with appropriate zoning and access to transportation infrastructure, such as roads and pipelines. You'll also require significant capital investment for construction and equipment, along with technology for refining processes. Additionally, securing necessary permits and adhering to environmental regulations are crucial, along with a skilled workforce to operate and maintain the facility. Finally, a reliable supply of crude oil and a market for the refined products are essential for the refinery's operation.


how much land is required to build a petroleum refinery?

The land required to build a petroleum refinery can vary significantly based on its size and complexity. Typically, a small to medium-sized refinery might require around 50 to 200 acres, while larger refineries can need anywhere from 200 to over 1,000 acres. Factors such as the type of crude processed, production capacity, and regulatory requirements also influence land requirements. Additionally, space for supporting infrastructure and safety buffers is often necessary.


Where do you need to build a Oil refinery by the sea?

you don;t, that is probably the worst place to build one because of the pollution it would cause to the ocean and marine animals. +++ That's wrong because it assumes the refinery will be built and run badly, whereas they are normally subject to stringent laws; and while mistakes and accidents in any man-made system can and do occur, the owners do take every precaution to minimise the risks. Refineries are by the sea because many oil and gas reserves are under the sea-bed, and much of the world's oil trade depends on sea transport by pipe or ship.


Where are refineries located?

No. The last refinery was built in 1976 and there are no plans to build any new ones. Existing petroleum refineries are experiencing declining operating revenues and are actually reducing their capacity to around 80%. This is in part due to the economic downturn and in part a result of a continuing downward trend in the refining industry that began in 2005. Imports of refined products are increasing to fill the gap between domestic supply and demand, though even these have declined as overall consumption has dropped from 2005-2008. Hope that helps!

Related Questions

What are the issues that when deciding where to build power station?

away from urban areas and less distance from fossil fuel areas to power station


Where did john d Rockefeller first build an oil refinery?

Ohio


How much Area required to build oil refinery?

1 acre


You often use geography when you are deciding where to build a neighborhood?

Geography is a significant determinant when deciding what to build. The topography of a neighborhood determines whether a builder can build in the area.


How long does it take to build an oil refinery?

about a fiver


What are two thing you should consider when deciding where to build your shelter?

pie


What are 2 things you should consider when deciding where to build you shelter?

Safety and Comfort.


What do you need to build a refinery?

To build a refinery, you need several key components: land with appropriate zoning and access to transportation infrastructure, such as roads and pipelines. You'll also require significant capital investment for construction and equipment, along with technology for refining processes. Additionally, securing necessary permits and adhering to environmental regulations are crucial, along with a skilled workforce to operate and maintain the facility. Finally, a reliable supply of crude oil and a market for the refined products are essential for the refinery's operation.


How do you do the engineer glitch in command and conquer 3 tiberium wars?

At the start build a CRANE then build a power plant in the crane and a REFINERY in the COMMAND CENTER, when the POWER PLANT is built, drop it down then build a BARRACKS and build an ENGINEER from it. When the REFINERY is built drop it down and build a COMMAND POST. When it is built drop it down. Build POWER PLANTS in both COMMAND CENTER and CRANE, and use the radar to see over the enemy base, use the ENGINEER to capture an enemy building, before it goes out of the build radius drop both POWER PLANTS on top of the ENGINEER and the ENGINEER will disappear and capture the enemy building auto-matically.


how much land is required to build a petroleum refinery?

The land required to build a petroleum refinery can vary significantly based on its size and complexity. Typically, a small to medium-sized refinery might require around 50 to 200 acres, while larger refineries can need anywhere from 200 to over 1,000 acres. Factors such as the type of crude processed, production capacity, and regulatory requirements also influence land requirements. Additionally, space for supporting infrastructure and safety buffers is often necessary.


Who was involved in the south dale mall?

teenagers that helped build it.


Who was involved in the making of the London underground?

Charles Pearson, it was his idea to build it.