answersLogoWhite

0

2288777744x10 to the power of Bush

User Avatar

Wiki User

14y ago

What else can I help you with?

Continue Learning about Civil Engineering

How much concrete for 8x8 area?

To determine how much concrete is needed for an 8x8 area, you first need to know the thickness of the concrete slab. If, for example, the slab is 4 inches thick, you would convert the dimensions into feet (8 feet x 8 feet) and the thickness into feet (4 inches = 1/3 feet). The volume in cubic feet would be 8 x 8 x (1/3) = approximately 21.33 cubic feet. To convert this to cubic yards (since concrete is often sold by the cubic yard), divide by 27, resulting in about 0.79 cubic yards of concrete needed.


How much water is needed to build a house of concrete and bricks?

The amount of water needed to build a house of concrete and bricks can vary significantly based on the design and size of the house, as well as local building practices. On average, constructing a typical single-family home may require around 1,500 to 3,000 gallons (5,700 to 11,400 liters) of water for mixing concrete, mortar, and other needs. Additionally, water is also needed for curing concrete to ensure proper strength and durability. It's essential to consider local regulations and practices, as they may affect water usage.


How much concrete do i need to fill a trench that is 10x14x 90'?

To calculate the volume of concrete needed to fill a trench that is 10 feet wide, 14 feet deep, and 90 feet long, you can use the formula for volume: length × width × depth. This gives you a volume of 90 ft × 10 ft × 14 ft = 12,600 cubic feet. Depending on how you plan to order the concrete, you may want to convert this volume into cubic yards by dividing by 27, resulting in approximately 466.67 cubic yards of concrete needed.


Concrete costs per square foot?

how much does concrete cost per square foot


How much concrete do you need to cover a driveway 9x150?

To calculate the amount of concrete needed to cover a driveway that is 9 feet wide and 150 feet long, you first find the area by multiplying the width by the length: 9 feet × 150 feet = 1,350 square feet. The depth of the concrete layer is also needed to determine the volume. For example, if you want a thickness of 4 inches (0.33 feet), the volume would be 1,350 square feet × 0.33 feet = 445.5 cubic feet.

Related Questions

What is the equation to figure out how much concrete is needed?

its about 12x5x67 respectively


How to calculate how much concrete is needed for a project?

To calculate the amount of concrete needed for a project, you need to determine the volume of the area to be filled with concrete. This can be done by multiplying the length, width, and height of the area. Once you have the volume, you can then calculate the amount of concrete needed by dividing the volume by the coverage area of one cubic yard of concrete. This will give you the total number of cubic yards of concrete needed for the project.


How much concrete is needed for an area 8' x 4' and 3 deep?

96 cubic feet of concrete


How much concrete is needed for a 16x32 kidney shaped pool?

a lot.


How much concrete is needed area 20ft long by 12inches wide and 4 inches deep?

0.246914 cu. yards (6.666667 cu. ft ) of concrete is needed.


How much cost the aggregate that used for mixing one ton of asphaltic concrete?

First find out how much concrete is needed for your project thwn do the calculations.


How much concrete is needed for a fence post?

The amount of concrete needed for a fence post depends on the size and depth of the hole. Typically, a 50 lb bag of concrete mix is enough for one standard fence post.


How much concrete is needed for a slab 40x25x4?

Approximately 12.35 Cubic Yards.


How much concrete for 12 feet by 4.5 feet?

The depth of the pour would also be necessary to calculate the volume of concrete needed.


How much concrete is needed per fence post?

The amount of concrete needed per fence post depends on the size and depth of the hole, but typically around 1/2 to 1 cubic foot of concrete is used per post.


How much concrete is needed to effectively stop radiation?

Concrete is a common material used to shield against radiation. The amount of concrete needed to effectively stop radiation depends on the type and intensity of the radiation. Thicker layers of concrete provide better protection against radiation. Generally, a thickness of at least several feet of concrete is needed to effectively stop most types of radiation.


How much concrete is needed for a slab 2000 square feet?

It depends on the depth required