Water proofing treatment with 50mm thick screed in cm(1:5),115(thick brick bat in cm (1:3, third layer or 25thick in 33(1:3)=1.18 bags per sequre meter

User Avatar

Wiki User

12y ago
This answer is:
User Avatar
More answers
User Avatar

Anonymous

Lvl 1
3y ago

4 bags

This answer is:
User Avatar

Add your answer:

Earn +20 pts
Q: What is the Cement consumption for brick bat coba?
Write your answer...
Submit
Still have questions?
magnify glass
imp
Related questions

Weight of brick bat coba slab?

Density of brick bat coba


What is the Difference between IPS and Plain Concrete Cement Flooring?

how is conventional brick bat coba work done


Is codes on Brick Bat Coba?

No, Integral WP admixture which is added in coba mortar has IS2645, but lonely coba has not any IS codes. Hassan 09889987866


What are the Disadvantages of Brickbat Coba?

1. Brickbat coba will have lot of surface cracks and hence it is not a waterproofing system. 2. The quality of bricks used in BBC is usually of not a good quality hence over a period of time they absorb water and become loose and give way to more leakages. 3. Brick bat coba should not be confused for waterproofing. It is a good wheather proof layer.


What is brick bat coba?

Water proofing with Brick bat Coba by Exposing the RCC Slab to its bare Surface, Clearing the Surface of all Lose Particles and Dust, Carting away of debris and Spreading neat Cement Slurry mixed with waterproofing Compound on the Cleaned Surface, filling up the uneven Surface, honey Combing etc. Spreading of CM(1:5) mix, mixed with Water proofing Compound and Grouting brick bat in the Mortar with Necessary Slope of approx. 1 in 100 for Easy flow of Water. Filling the Joints in the bricks with the Mortar properly. This treatment to Continue along the inner Side of the Parapet or other Adjoining Walls up to a height of 30 cm in the Shape of a round Vatta and finally Converting the top Surface with Jointless Waterproofing Cement Sand Mortar 1:4, 20 to 25 mm thick finished Smooth with Trowel in Cement Colour marked into 30cms x 30 cms False Squares. The Average thickness of Complete treatment shall be 100mm. Curing to be Continuously done for Surface.


Why is half a brick called a bat?

Because half a brick weighs the same amount as the average bat


What is half a brick called?

Bat


How to Waterproof Toilets & Bathroom in 14 Steps?

Steps for Waterproofing Bathroom/Toilet: Step 1. Remove the existing W.C. pan tiles etc and break open the exciting brick bat coba and I.P.S toilet/bathroom and reach the bare slab. Step 2. Moisten the crack and apply a Bonding Coat of POLYALK EP and cement slurry in the ratio of 1:0.5 in the groove Step 3. Within 30 minutes of application of Bonding Coat. Prepare and apply by hand POLYMER MODIFIED MORTAR using 2 Kg POLYALK EP, 5 Kg cement, 15 Kg graded quartz sand. DO NOT ADD ANY WATER TO THIS MORTAR. This has to be a wet-on application. Step 4. Air Cure the surface for 48 Hrs Step 5. Sprinkle Water for 3-4 days Step 6. Clean the slab of all dust, dirt oil, grease, grime, etc. Step 7. Drill holes in the slab and fix nipples and inject grout by mixing 5% of POLYALK EP and POLYTANCRETE NGT@150mls both per bag of cement. Add water as a minimum for flowability. After grouting is completed cut and seal the nipples by Polymer Modified Mortar. Step 8. Prepare a slurry using 1 Kg of POLYALK WP and 0.25 Kg of cement and apply by brush on the bare slab. Mixing should be done using a low-speed stirrer to form a lump-free consistency. NO WATER TO BE ADDED PREPARE AS MUCH SLURRY AS CAN BE USED IN 30 MINUTES. Step 9. After 24 hours, apply a second coat of similar slurry of the same proportion. Step 10. Air Cure the surface for 48 Hrs. Step 11. Cure the coating with damp gunny bags for 4-5 days. Step 12. Apply the third coat of slurry using 1 Kg of POLYALK WP and 0.25 Kg of Cement and apply by brush on the second coat. NO WATER IS TO BE ADDED. Step 13. While this coat is wet and tacky lay the cement mortar for providing brick bat coba. This has to be a wet-on-wet application. Add SUNPLEX (330 gms pouch) per 50 Kgs bag of cement in the mortar mix for brick bat coba. Step 14. Proceed with providing conventional brick bat coba. I.P.S over the slab and fix tiles/pan as per requirement. Add SUNPLEX (330 gms) pouch in the cement mortar mix of the I.P.S to minimize the shrinkage cracks on the IPS.


What is the full form of BBLC in civil line engineering?

Brick Bat Lime Concrete


On Lego Batman how do you buy stuff?

Go to the bat computer to buy stuff PS:You may have to beat a level or get a red brick from free play.


Are you guys doing the worksheet for Mrs. Oster... Shes a mean old bat?

Omfg ikr l wanna knock her in the head with a brick!! ;D


What happens if you drink vampire bat blood?

Drinking vampire bat blood can potentially transmit diseases such as rabies or other infections that the bat may carry. It is not safe for human consumption and could lead to serious health issues. It is best to avoid consuming any type of animal blood.