It is a period considered appropriate to the function of the road. An arbitrary design period (say 25 years) needs to be chosen to enable the design of the road pavement to be developed. The determination of the total traffic the road will experience is a function of the design life chosen, and an estimate of the steady traffic growth expected over that period (say 2%). The resulting Design Traffic calculation is then used to determine what thickness the pavement should be to handle the stresses exerted on it from road vehicles over 25 years. It is accepted that after 25 years the pavement will likely need some sort of rehabilitation or construction, and the design process starts over again.

User Avatar

Wiki User

15y ago

What else can I help you with?

Continue Learning about Civil Engineering

Four factors to be considered in the design of a road or highway?

time, money, and food


What is the profession of road builder?

A road builder is a construction professional who specializes in the design, construction, and maintenance of roads, highways, and other transportation infrastructure. This role typically involves working with heavy machinery, materials, and engineering principles to ensure safe and durable roadways. Road builders collaborate with engineers, architects, and local authorities to meet specific project requirements and regulations. Their work is crucial for enhancing transportation networks and supporting economic development.


What is fundamental period of a building?

The fundamental building period is simply the inverse of the building frequency at the lowest harmonic - easy right? Basically, every system has a set of frequencies in which it "wants" to vibrate when set in motion by some sort of disturbance (in building design, typically a seismic or wind event) based on the system's mass and stiffness characteristics. The shortest frequency is known as the natural frequency. The inverse of frequency is the period of the system, and more specifically, the inverse of the natural frequency is the fundamental period.


What is the slope of the cut and fill along side a road called?

The slope of the cut and fill alongside a road is called the "embankment slope" or "borrow slope." It refers to the graded side slopes created when soil is excavated (cut) and used to build up an area (fill). Proper design of these slopes is crucial for stability and drainage, ensuring safety and longevity of the roadway.


How you can design rcc structure?

to design rcc structure in 3 types

Related Questions

What is the deadliest 3-hour period on the road?

Statistics suggest that the deadliest 3-hour period on the road is from


What is the duration of The Road of Life?

The duration of Road to Life is 1.85 hours.


When was Road to Life created?

Road to Life was created in 1955.


What does As-Built mean in road design?

It means exactly what it says. A road is constructed according to the design shown in plans and specifications. When changes are made during construction because of unknown changes in conditions, the plans are changed accordingly. The resulting plans are called As-built drawings. Sometimes in road design, the road is built without plans.... just a typical section. Then the road is surveyed and as-built plans are drawn without an initial design including route and elevations.


When was A Design for Life created?

A Design for Life was created on 1996-04-15.


Will any car amplifiers survive in an off road vehicle?

No. There are special off road amplifiers design for off road vehicles.


When was The Road of Life created?

The Road of Life was created on 1956-06-29.


What is the recommended spindle length for a road bike with a compact frame design?

The recommended spindle length for a road bike with a compact frame design is typically around 103-107mm.


What phenomena contributes to traffic congestion?

Poor road design.


What is a bend in a road called?

A bend in a road is commonly referred to as a curve. It is a change in the road's direction, typically caused by factors such as the terrain or design of the road.


What is a crowned road?

A crowned road is a type of road design where the center of the road is built higher than the edges, allowing water to run off to the sides. This design helps prevent water from pooling on the road surface, reducing the risk of flooding and improving driving safety.


What is tumbstone life period?

The default tumbstone life period is sixty days.