A contractor quantity surveyor is professional who practice quantity surveying profession for the safe guardness and the benefit of a contracting firm in which some of his responsibility will be to submit tender documents for the and also to supervise and take proper measurement of every job done by the company while a consultant quantity surveyor helps his client to get proper value for his money in executing and project, he gives cost advice to the client atv the prelimnary stage ogf construction and he still makes sure the standard of workmanship, plant and functionality is still maintained..... though both are only aiming toward same primary goal which is to provide value for the person they are representing and at the same time still optimize production and qualitative standard of job done.....

What else can I help you with?

Continue Learning about Civil Engineering

What is the difference between A contractors and B contractors?

A contractors (also called Class A) are licensed to work on large-scale projects like commercial buildings, multi-family units, or anything involving complex structures and systems. They can build from the ground up, including high-rise buildings, shopping centers, and big apartment complexes. A contractors have to meet higher experience and qualification requirements. On the other hand, B contractors (Class B) are general building contractors who typically handle residential or smaller commercial projects. They can build homes, remodel buildings, and manage construction where at least two unrelated trades are involved (like plumbing and electrical). However, they usually can’t take on massive structural work unless it falls under their license scope.


How much do paving contractors charge per hour?

According to Docstoc.com, paving contractors typically charge between $60 and $100 per hour. They may charge other fees such as site visit fees or preparation fees.


What are the differences between freehand and CAD?

Freehand drawings can be made on any piece of paper anywhere. Computer Aided Design drawings are only made on a computer and are confined to what the computer program will do


What are the main sections of bill of quantities?

The main sections of a Bill of Quantities (BoQ) typically include the preamble, which outlines the document's purpose and general conditions; the measured works section, detailing quantities and descriptions of materials and labor required for the project; and the pricing section, where contractors provide their cost estimates for each item. Additional sections may include summary tables, site information, and specific trade sections to organize work by discipline. This structured format helps in accurately estimating project costs and facilitating clear communication between clients and contractors.


What are the advantages of the architect over the project manager in project management?

This question requires an elaborate answer, here's an excellent article on the differences (and the advantages) between the project architect and the project manager: http://www.pmhut.com/project-architect-vs-project-manager

Related Questions

What does a land surveyor do?

A land surveyor measures and maps land. The purpose is to establish boundaries between parcels of land as well as provide legal documents.


What does a an offshore surveyor earn?

Typically between 85000-143000 depending on experience.


What is one difference between government corporations and government contractors?

Government corporations are in the public sector while government contractors are in the private sector.


What is the difference between a land surveyor and quantity surveyor?

A land surveyor is responsible for measuring and mapping the land, while a quantity surveyor focuses on estimating and managing costs related to construction projects. Land surveyors work on the physical aspects of a piece of land, while quantity surveyors deal with the financial aspects of construction projects.


What are things to look out for when choosing between different cleaning contractors?

There are many things to look out for when choosing between different contractors for cleaning. These include experience, cost, location, reputability, reviews and efficiency.


Differences between 1950s and now?

differences between now and then 1905s


Differences between fraud and error?

differences between errors and frauds


What is the difference between a prime contractor and a subcontractor?

The prime contractor is contracted by the end customer. Sub-contractors are contracted by the prime contractor or other sub-contractors.


What is the differences between classification and tabulation in statistics?

Differences between Classification and Tabulation


What are differences between Mesopotamia and Sumeria?

what are the differences between indus and sumer civilization


What is one difference between government agencies anf government contractors?

H


How much money do tile floor contractors make?

Tile floor contractors make between 37k and 57k a year. These salaries may vary depending on your location.