minimum curing period of concrete is 21 days and maximum is 28 days
21 days
There are no curing time requirement for prime coat. You can asphalt rigth away after your prime as long as the prime have the proper temperature. There are curing time for TACK COAT which is different. (TACK IS OVER ASPHALT,PRIME IS OVER BASE ROCK ).Is a common mistake confuse those two different operations. The curing time for TACK depend of the weather and varie between 8 hrs to 24 hrs. Gustavo Cuenca Civil Engineer.
In anarid region, concrete placed as a road slab or roof slab gets dried up in a very short time, say within 2 hours.This condition should be maintained for 24 hours or at least till the final setting time of cement at which duration the concrete will haveassumed the finalvolume.Normally curing is done for 28days at 90% of strength gain is achievedUntil maximum design strength is achieved (should be 28 days): Concrete does not gain strength by "Drying out". It gains it through a process known as hydration. The road slabs used as an example in the first post will still undergo hydration once water makes contact with the concrete. (rain). k.k
Cement, sand, gravel and water are the most commonly used minimum ingredients to make concrete. However various types of admixtures can be added while making concrete to enhance its properties such as workability, setting time, strength, permiability, durability, chemical resistance, etc.
concrete (cement) cures with age, well at least up to a point. think of breaking up the concrete slab that was cast yesterday evening, versus a concrete slab that is a year old. the optimum strenght of concrete (maximum strenght it is assumed to reach) is statistically reached after 28 days, if proper and adequate curing took place, and normal working / exposure conditions and control of quality took place. Curing is basically protection against severe exposures as draft winds that may cause cracking, and keeping the surface moist over the 7 days, by covering it with DPC plastic or regular sprinkling with water. after only 7 days of curing, the 28 day strenght can be accurately predicted to determine if it will pass the requirements. after 7 days (I have also seen 24hrs samples) a cube sample is crushed to determine the 7 day crushing strength. this sample was then cast at the same time as the structure being assessed. the 7 day strenght is measured in Mega Pascals (Mpa) or equivalent units Kilo Newton per square millimeter (kN/mm2) and really depends on the application the concrete is used for: walkways will probably be 10Mpa single storey building footings and floor slabs, say 15Mpa floor slabs where vehicles may drive could be even 35Mpa. Suspended slabs, like first floor slabs etc, say 40Mpa.
curing time of concrete 14-28 days
21 days
concrete grade and strength are both revalent since if grade increase setting time will be less and curing to be done propely so that concrete strength will reach higher. If concrete grade is low curing to done longer days upto intial setting time to reach proper strength
Concrete increases in strength over time after it first hardens. This process is known as curing. As such time has to be left after concrete has initially set to reach it's design strength (this normally takes around 28 days).
There are no curing time requirement for prime coat. You can asphalt rigth away after your prime as long as the prime have the proper temperature. There are curing time for TACK COAT which is different. (TACK IS OVER ASPHALT,PRIME IS OVER BASE ROCK ).Is a common mistake confuse those two different operations. The curing time for TACK depend of the weather and varie between 8 hrs to 24 hrs. Gustavo Cuenca Civil Engineer.
Rockbottom period is 7 days once quality concreting is done and meticulous watering the concrete , otherwise normally 21 days is recokened as the period for curing the concrete( that is, setting the concrete) to take care of failure to adhere to correct processing of laying concrete and curing with water .
That depends on the concrete, as well as weather conditions, and the load the concrete would be subjected to. Concrete gains strength over time and the usual benchmarks are 7 days, and 28 days. At 28 days concrete has usually cured to nearly its maximum strength. For a concrete footing in a residential environment say a deck or home the concrete will usually cure for a minimum of three days before the formwork is removed and the rest of the structure is built. For a commercial or civil project the curing is subject to the engineers discretion.
It is the time delay between a maximum or minimum insolation and maximum or minimum air temperature
Both
Maximum time of Day in solar syatem is VENUS, Minimum JUPI..
There isnt a set minimum or maximum.
Some types of variable star vary very regularly, and their time of maximum and minimum can be found from data. Others are irregular and the only way to find the maximum and minimum is to keep observing them and measuring the brightness.