answersLogoWhite

0

It is best to remove the vinyl tile. If it is not on cement and is on wood you can install cement backer board. Be sure to put thin set under the board. If you spend the money and time to install ceramic tile and the vinyl tile comes loose all that $ is down the drain

What is the best tile cement to use and this cement tile can be installed on vinyl tile and install ceramic tile on it

User Avatar

Wiki User

14y ago

What else can I help you with?

Continue Learning about Civil Engineering

Install ceramic tile?

The key to how to lay ceramic tile is preparation and having the right tools. 1. Measure opposite sides of the room and mark the centerof each side. Snap a chalk line between the marks. Measure and mark the center of the chalk line. From this point, use a framing square to establish a second line perpendicular to the first. Snap a second layout line across the room. 2. Check for square with a 3-4-5 triangle. Measure and mark one layout line 3 feet from the center point. Measure and mark the perpendicular layout line 4 feet from the center point. Measure the distance between the marks. If the layoutt lines are perpendicular the distance will be exactly 5 feet. 3- Lay tiles and spacer along one line from the center to the wall. 4- Divide the floor into manageable boxes, roughly 2-feet-by-3-feet for setting the tiles. Begin by laying out an L shape in the center of the room. Use the chalk lines as a guide, and separate the tiles with spacers. 5- Measure both branches of the L from the center to determine the size of the boxes you will lay out on the floor. Add the widthe of one spacer to each measurement. 6- Remove the tiles. Lay out a chalk-line grid, with each box the size of the sample you measured in Step 5. 7- Do a dry run to determine the placement and cuts. Place a row of tiles along each line using spacer. 8. To set tiles after proper preparation of the surface, begin at the center of the room and work out. Follow working lines and keep tiles aligned with plastic spacers.


What is the differences between the contractors and consultant-quantity- surveyor?

A contractor quantity surveyor is professional who practice quantity surveying profession for the safe guardness and the benefit of a contracting firm in which some of his responsibility will be to submit tender documents for the and also to supervise and take proper measurement of every job done by the company while a consultant quantity surveyor helps his client to get proper value for his money in executing and project, he gives cost advice to the client atv the prelimnary stage ogf construction and he still makes sure the standard of workmanship, plant and functionality is still maintained..... though both are only aiming toward same primary goal which is to provide value for the person they are representing and at the same time still optimize production and qualitative standard of job done.....


What is maximum cantilever possible in r.c.c. beam?

ITS 5.5m TO 6m AS PER MY KNOWLEDGE AS POSSIBLE WILL BE SAFE & BETTER STABLE WHEN PROPER BACK ANCHOR IS GIVEN


What is important of size shape texture of coarse aggregate sa on ingredient of concrete?

so it will insure the proper mixure in the batch plant, as well as the testing goes. it has to hold so many psi's for so many hours before going to the job site


Why are expansion joints required in brick walls?

Even a well constructed slab will move. Without an expansion joint you will see cracks in the brick develop over time. A proper expansion joint is one where one side does not touch the other... not even mortar, then filled with silicone.

Related Questions

Is there a proper procedure for the Pledge of Allegiance?

Proper procedure? Can either hand (left or right) be used when reciting the Pledge of Allegiance.


Standard operating procedure of McDonald fastfood?

The standard operating procedures of McDonald's, include having a proper uniform. McDonald's also has a certain way they prepare food, which are considered operating procedures, because it keeps the business running quickly and efficiently.


What is the proper procedure for laying down wood flooring?

One should follow certain steps for laying down wood flooring. One should first pre-drill the holes for the nails. Then, one should spread the wood across the room to create the layout. One should use a flooring nailer to nail down the rows of wood.


Can you install ceramic tile over existing ceramic tile?

Yes, it is possible to install ceramic tile over existing ceramic tile, but it is important to ensure that the existing tile is in good condition and properly prepared before doing so. Proper surface preparation and adhesion are key to a successful installation.


What is the proper procedure to signal on city street?

200


A sentence for procedure?

Follow the established procedure to ensure proper completion of the task.


What is the proper procedure of food and beverage service?

water and pepsi


When would the wearing of safety goggles be proper procedure?

The wearing of safety goggles would be proper procedure when your face or eyes may be exposed to dust and flying objects, or to chemical splashes.


what is a proven method to maintain healthy bones?

proper exercise and eat the proper meal for your healthy procedure


What is a good sentence for the word procedure?

I have several sentences for you.It is procedure to check in at the front desk.Always follow proper procedure.Police procedure requires a chain of evidence.


Should I charge the battery by connecting the red or black cable first?

When charging a battery, it is recommended to connect the red cable first, followed by the black cable. This is the standard procedure to ensure safe and proper charging.


Do you have to remove old grass before laying sod?

Yes, it is recommended to remove old grass before laying sod to ensure proper growth and establishment of the new sod.