366
Usually 42-48 hours a week if they are a direct hire for a company. If the Net. Tech. is on contract, then his hours will vary anywhere from 32-65 hours a week depending on the assignment; 32 hours for running diagnostics and benchmark tests on existing mainframes. about 60-65 hours for reconfiguring 100 IBM Supercomputers with 16 nodes each or re-wiring the cabling infrastructure of existing mainframes in other to allocate more space for new supercomputers.
42 cents. But if you don't want to buy a 42 cent stamp then go ahead and put 42 1 cent stamps on there.
No the current rate is 44 cents.
42 cent for an ordinary first class letter.
Threadneedle Street39 Threadneedle StreetLondonEC2R 8AU
42 + 65 = 107
GCD(42, 65) = 1
65/42 is in its simplest form.
LCM(65, 42) = 2730.
42/65 cannot be simplified further.
The GCF of 42, 65, and 10 is 1.
It is the highest common factor of 390 and 65 which is 65
-65
1, 2, 3, 6, 7, 14, 21, 42 1, 5, 13, 65
It is 7 which is the HCF of 35 and 42
65
65.1905