If memory serves me correctly it takes 3 80lb bags to make a cubic ft so one bag is .3333 cubic ft.
it is 2400 kg
One cubic yard of concrete typically weighs about 4,000 pounds. Since each 80-pound bag of concrete contains approximately 0.6 cubic feet, you would need about 45 bags to equal one cubic yard of concrete. Specifically, 1 cubic yard equals 27 cubic feet, so dividing 27 by 0.6 gives you around 45 bags.
41 bags. Actual 40.5
Cause they're made of cubic zirconia, which is greater than or equal to the hypotenuse of a right triangle
To convert cubic meters to metric tons, you need to multiply by the density. Cubic meters to metric tons: 1 m^3 of concrete * 2400 kg/m^3 = 2400 kg or 2.4 metric tons. Therefore, 1 cubic meter of concrete with a density of 2400 kg/m^3 is equal to 2.4 metric tons of concrete.
A yard of concrete is a measure of volume. A square foot is a measure of area. A cubic yard is 27 cubic feet of stuff. (3x3x3)To relate volume to area you must extend the area over a third dimension. One square foot that is one foot deep will equal one cubic foot. (1x1x1)So, a yard of concrete is 27 cubic feet or 3 feet tall 3 feet wide 3 feet deep. concrete wieghs 150lbs per cubic foot 27cubic feet times 150 pounds is 4050 pounds. This is 1 cubic yard of concrete.
One cubic meter of concrete is equal to 1.308 cubic yards of concrete. If there are 5 1/2 bags of cement in 1 cubic yard of concrete, there would be 7.2 bags in 1 cubic meter of concrete. These are the 94 pound bags of portland cement or roughly 40kg bags so figure 8 bags total. Some will be left over
Slightly less than 1. 5x10 is 50 square feet. If the pad was 6 inches thick that would equal 25 cubic feet. There are 27 cubic feet in 1 cubic yard.
When it comes to mulch or concrete, a so-called "yard"actually means a "cubic yard".1 cubic yard = 27 cubic feet2 cubic yards = 54 cubic feet...6 cubic yards = 162 cubic feet ( = 81 bags )
To calculate the volume of concrete needed for a 24'x24'x4" slab, first convert the dimensions to feet: 4 inches is equal to 1/3 feet. The volume in cubic feet is 24 x 24 x (1/3) = 192 cubic feet. To convert cubic feet to cubic yards, divide by 27 (since there are 27 cubic feet in a cubic yard): 192 ÷ 27 ≈ 7.11 cubic yards. Therefore, you will need approximately 7.11 yards of concrete for the slab.
Cement content varies on concrete type, but is typically 400kg per cubic metre. According to the manufacturer, Portland Cement (which is what 99.9% of all cement actually is) has a density of 1505kg/cubic meter.
No. 36x36x36 is the cubic inches in a cubic yard. 46656 cubic inches equal a cubic yard.