41 bags. Actual 40.5
One cubic yard of concrete typically weighs about 4,000 pounds. Since each 80-pound bag of concrete contains approximately 0.6 cubic feet, you would need about 45 bags to equal one cubic yard of concrete. Specifically, 1 cubic yard equals 27 cubic feet, so dividing 27 by 0.6 gives you around 45 bags.
7 cement bags per 1 cubic meter of concrete......
about 60 60lb bags
According to Blue Circle it takes 108 bags of concrete to get a cubic meter
One cubic meter of concrete is equal to 1.308 cubic yards of concrete. If there are 5 1/2 bags of cement in 1 cubic yard of concrete, there would be 7.2 bags in 1 cubic meter of concrete. These are the 94 pound bags of portland cement or roughly 40kg bags so figure 8 bags total. Some will be left over
Forty five 80 pound bags of cement are needed to make one cubic yard of concrete.
If memory serves me correctly it takes 3 80lb bags to make a cubic ft so one bag is .3333 cubic ft.
Each 60 pounds bag of ready mix concrete will make .45 cubic foot of concrete. There are 27 cubic feet in a cubic yard. You will need 60 bags of 60 pound premixed concrete to make 1 cubic yard.
1.8 Cubic yards of concrete is 48.6 cubic feet. Each 80lb bag of concrete is .6 cubic feet. Therefore, you would need 81 bags. Hope that helps. GEO
To determine how many bags of concrete are needed for 1.78 cubic yards, first note that a standard bag of concrete typically contains 0.5 cubic feet. Since there are 27 cubic feet in a cubic yard, 1.78 cubic yards is equivalent to 1.78 x 27 = 48.06 cubic feet. Dividing 48.06 cubic feet by 0.5 cubic feet per bag gives approximately 96.12 bags. Therefore, you would need about 97 bags of concrete to cover 1.78 cubic yards.
There are approximately 27 cubic feet in a cubic yard, and an 80-pound bag of concrete typically yields about 0.6 cubic feet. Therefore, to fill one cubic yard, you would need about 45 bags of 80-pound concrete.
?