They are both cell references. A6 is the cell where column A meets row 6. E9 is where column E meets row 9.
It it a formula in a spreadsheet requiring the summing of the values in cells E9 to E12, both inclusive.
Generally it would still be called a spreadsheet, but it could be called a What-if spreadsheet.
The area of the screen where you interact with a spreadsheet is called the spreadsheet workspace or spreadsheet view. It is where you input, view, and manipulate data within the cells of the spreadsheet.
A spreadsheet is sometimes called a worksheet.
It is called a spreadsheet or a worksheet.
How can we changed E9 to E7
It usually is called a spreadsheet. Microsoft Excel calls it a worksheet.
In a spreadsheet a built-in formula is called a function.
5.378 E9 = 5.378 × 10⁹ = 5,378,000,000
One location on a spreadsheet is called a "cell".
How to change E9 visa canghe ........posebal
It can be called a worksheet. There is a range of actual spreadsheet programs, so people often refer to them directly, like Excel or Quattro or Works or Open Office or Lotus 123, instead of using the term spreadsheet.