answersLogoWhite

0


Best Answer

Procedure for sumpners test is the single phase transformer. This is a back to back test.

User Avatar

Wiki User

9y ago
This answer is:
User Avatar

Add your answer:

Earn +20 pts
Q: Procedure for sumpners test
Write your answer...
Submit
Still have questions?
magnify glass
imp
Continue Learning about Electrical Engineering

Why sumpners test is called heatrun test?

The temperature rise is not considered in OC & SC tests of transformers.. But in Sumpner's test, temp. rise is considered.. Hence is called "Heat-run test".. Also, the transformers draw only the power req. to supply core & Cu. losses of transformer..


How do you perform the safe isolation procedure?

The 'Safe Isolation Procedure' is a procedure carried out to ensure that you are working safely on electrical equipment. Firstly, you isolate the power at the fuse board. It's best to switch each circuit off one by one starting furthest away from the main red switch (I'm not 100% sure why but its something to do with voltages). You then erect barriers and signs. You then lock off at the main switch and remember to keep the key on your person. After this you use a certified voltage tester (preferably a gs38) to check if the board is dead. Give the tester a thorough inspection check leads and probes and then use the proving unit to check it's not faulty. After this you then test at the board main L to main N, then main L to man E, then main N to main E (3 point test). You then test at your proving unit again to check testers not faulty and then commence work.


What are precommissioning tests of transformers?

magnetising current test, magnetising balance test, s.c test, vector group test, winding resistance test, ratio test


What is pressure test for transformmer and how to test?

On installed transformer a test is performed to check weather it has any oil leakage or not, the test is called pressure test, more precisely pressure leakage test.


How will be conduct test on transformer?

Short circuit test and open circuit test are widely used to test the efficiency of the transformer.

Related questions

Why should you use sumpners test on transformer?

sumpners test is performed to find core losses and copper losses.here we can find effieciency and regulation by actually simulating the loading conditions.hence the results obtained by this method are more accurate than oc and sc test where loading conditions are absent.we can perform heat run test which is an advantage of sumpners test as both losses occur simultaneously


What do you mean by sumpners test?

Its a test conducted on two identical 1- phase transformers to determine the efficiency at different loads (without actually connecting any load).


Why sumpners test is called heatrun test?

The temperature rise is not considered in OC & SC tests of transformers.. But in Sumpner's test, temp. rise is considered.. Hence is called "Heat-run test".. Also, the transformers draw only the power req. to supply core & Cu. losses of transformer..


Is test tube baby procedure painful?

is test tube baby is procedure is painful?


What is the hydro test procedure?

What is the procedure for hydro-testing?


What is the hydro-test procedure?

What is the procedure for hydro-testing?


What is planned procedure to test a hypothesis called?

The name of this procedure is experiment.


What is A planned procedure to test a hypothesis is called?

The name of this procedure is experiment.


Procedure of chyle test in urine analysis?

test procudure


What is the name of the procedure for using a test case to test a specific unit of code?

step=by-step procedures Unit testing is a procedure


Does stucco has a pull test procedure and or NOA.?

You can get the information about stucco has a pull test procedure and or NOT from architecture.about.com/library/bl-preservationbrief-stucco02.htm


A planned procedure to test a hypothesis?

bi