ICS 204
This is what the value would be on a rating system. There are several different values that can be assigned and they help to determine how well the product is working.
If this is a homework assignment, please consider trying to answer it yourself first, otherwise the value of the reinforcement of the lesson offered by the assignment will be lost on you.Time constant is an exponential function, in some kind of form of e(-T/t) where T is time and t is time constant. If you evaluate this for T=3 and t=1, you get about 0.05. This means that the voltage across the capacitor will reach 95% of its final value after three time constants.Whether this is 95% of 24V or 5% of 24V depends on how the circuit is designed, but the most probable answer with the limited information given is about 23V.
it would get a lot of voltage
The potential of each line of a three-phase system is displaced from the other two by 120 electrical degrees. The sequence, or order, in which the potential of each line reaches its peak value is termed the 'phase sequence' of the system. The 'normal' phase sequence of an alternator is considered to be the 'positive phase sequence', is arbitrarily assigned colours (e.g. red-yellow-blue, etc.), numbers (e.g. 1-2-3), letters (e.g. A-B-C), or a combination of letters or numbers (e.g. L1-L2-L3). If that alternator should run backwards, or (far more likely) if its terminals were disconnected and then incorrectly reconnected, the the sequence would be A-C-B (etc.), which would be considered to be 'negative phase sequence'. Before connecting two generators (or two complete transmission/distribution systems) together, their phase sequence must be confirmed as being the same. Reconnecting a three-phase motor with the wrong phase sequence would result in it running in the reverse direction and, possibly, damaging its load.
A purely resistive load would indicate whatever watts would be normal for that load. A purely reactive load would indicate zero on the watt meter, in the theoretical case, because the power factor would be zero.
PL 1
15 out of 30 would be a 50. That would be an F on an assignment.
Traditional cost assignment systems typically would assign directly to the cost objects the costs of those resource consumptions that can be economically traced directly to units of output requiring the resources.
It depends on the specific instructions given by your teacher or the context of the reading assignment. Typically, you would read the text assigned to you rather than choosing between reading about the plains or the desert. If unsure, it's best to refer back to the assignment guidelines or ask for clarification.
Yes. When a player is designated for assignment, the team has 10 days to decide what to do (release the player, trade the player, waive the player). Usually, the player is placed on waivers. If nobody claims the player, he can be assigned to the team's minor league system. In this case, it would be possible for the team that designated the player for assignment to recall the player to the major league team.
The assignment would be a comparison/contrast assignment.
Hope this gets to you before your assignment is late! To answer your question about the climate in Washington State, this may help you... http://www.climate.washington.edu/facts.html
The professor assigned the homework to the students.
the same
Because he felt likes he hadn't shown his true colors and really been able to have a job, like many normal people in the community, he becomes The Receiver. The most important job in the community.
if the resouce water will disappeared so what will happen??
You title is assigned by your employer and does not have to match your duties. If you would like to change your title, then you should speak with your manager or human resources.