Because the current is smal , the votage > current x ressistance willbe small and therefore will be only a smal percentage of the ht.
HT metering Kiosk is one which has to install between DP structure and HT panel if the distance between them was more than 15 mtrs to reduce voltage drop........
because our system form factor is 1.1
what HT Swichgear
The different testing steps of HT and LT panel include commissioning, sanctioning, erection and the CPP set. All this is done in the servicing of the transformers and the HT/LT control panels.
i have no idea, pls reply in detail.
HT metering Kiosk is one which has to install between DP structure and HT panel if the distance between them was more than 15 mtrs to reduce voltage drop........
It's the voltage: HT high voltage LT low voltage Tension = voltage (French?)
Note the HT side VOLTAGE,Current,P.F at the same time calculate the L.T side Voltage,current ,P.F.Convert the L.T side V,I,P.F to H.T side by using transformation ratio and calculate the Power in KW for both H.T side and L.T with respect to H.T Then Loss=H.T side power in K.W-L.T side power in K.W with respect to H.T
high voltage breaking capacity
high voltage breaking capacity
approx. 1000 volts
because our system form factor is 1.1
Dielectric Strength of Vacuum is more than that of Air. In HT voltage is more than LT. So VCB is used in HT & ACB in LT. Rakesh Gaikwad
Frist putt of the main incomer HT side then Rack out the breaker and put the LOTO after that Discharge the cable Both side (HT/LT).
The test equipment used to test high voltage cables is a hi-pot test where a high DC voltage is a applied to the cable. This voltage can be from 150% to 200% of the working voltage of the cable.See related links below.
the earth resister of ht power system is infinite.so for high resister, there are no current flow throught it.due to high resister most unwanted voltage pass througth it.
You need to specify the phase. I assume it is 3 phase system. Then the HT current is 30.3 amps