All concrete need curing, since blinding is not structural concrete and treated as leveling course only, duration of curing may reduced. There is no specific period mentioned in relevant standard for curing of blinding.
Concrete used as a profile course as blinding concrete Invented in 1964 by a man named Daniel Brady.
a thin layer of lean concrete, keirkil fine, or sand applied to the surface to smooth the cavity in order to provide a dry cleaning or a more durable
what is the purpose of reinforcing bars in a spread footing
no, not normally. It will cure more slowly and how much slower depends on how much dirt is piled on it.
all things that need to dry are based on 72 degrees concrete needs 30 days to fully cure.
a blinding concrete is a thin layer of lean concrete
Spoil concrete
Concrete used as a profile course as blinding concrete Invented in 1964 by a man named Daniel Brady.
1:2
A concrete driveway typically takes about 28 days to cure completely.
a bar, to cure his headache from that blinding white light on the road. :-)
28 days is the usual cure time for structural concrete. For street pavements and driveways made with 6-Sack concrete, 3 days of cure will support a car, but 7 to 10 days is required for it to support trucks. All concrete continues to cure forever, as long as moisture is present.
It typically takes about 24 to 48 hours for 6 inches of concrete to cure completely.
a thin layer of lean concrete, keirkil fine, or sand applied to the surface to smooth the cavity in order to provide a dry cleaning or a more durable
It typically takes about 28 days for 4 inches of concrete to fully cure and reach its maximum strength.
Concrete should cure for at least 28 days before it can be used for construction purposes.
length*breadth*depth of the structure=...........m3 of concrete is needed. .