You need to calculate the total volume of the space that the concrete has to fill.

if you're doing a slab 4" thick a cu. yd. will cover 81 sq. ft. Take the total area

and divide by 81 to get the number of yard needed.

User Avatar

Wiki User

14y ago

What else can I help you with?

Related Questions

How percent the wastage of concrete per cubic meter?

5%


How do you calculate Concrete volume on corrugated metal decking?

You need several quantities to calculate concrete volume for corrugated metal decking. You need both the flute height in inches, flute width in inches, flute foot in inches, sealant depth or thickness in inches, gap size in inches, and deck length in feet.


How do you calculate the vol of steel to a given vol of concrete?

how calculate steel in concrete


IS code on cement wastage?

The Indian Standards (IS) codes relevant to cement wastage primarily fall under IS 456:2000, which provides guidelines for the design and construction of reinforced concrete structures. While it does not explicitly address cement wastage, it emphasizes efficient use of materials and good construction practices to minimize waste. Additionally, IS 383:2016 specifies the quality and grading of aggregates, which can influence the amount of cement needed and consequently affect wastage levels. Proper adherence to these standards can help reduce cement wastage in construction projects.


How do you calculate concrete needed?

length*breadth*depth of the structure=...........m3 of concrete is needed. .


How to calculate how much concrete is needed for a project?

To calculate the amount of concrete needed for a project, you need to determine the volume of the area to be filled with concrete. This can be done by multiplying the length, width, and height of the area. Once you have the volume, you can then calculate the amount of concrete needed by dividing the volume by the coverage area of one cubic yard of concrete. This will give you the total number of cubic yards of concrete needed for the project.


Why underestimate the resistance of concrete to such a large extent when you design concrete columns?

The designers calculate the potential effects of cracking on the concrete columns.


How can you calculate for 1 cubic concrete steel requirement for raft foundation?

concrete and cementtarmacsmooth roadgood roadsfriction


What is solid wastage?

anything that's not liquid wastage.


How much concrete is needed for a slab 300 square feet by 6 inches thick?

Allow 5.5 to 6 yards. Always allow for wastage, underrunning forms, etc.


How do you calculate the yards of concrete needed for 3570 square feet?

How thick? Gotta have thickness to calculate cubic yards.


What syllable is stressed in the word wastage?